| S.No | Document Number | Document Title | Doc Type | Priority | Language | Document Stage | Last Action Date |
|---|---|---|---|---|---|---|---|
| 1 |
CED/24/08010 IS 12288 : 1987 |
Code of Practice for Use and Laying of Ductile Iron Pipes Amendment - 1 | Amendment | 3 | English | Proof to OSA | 05-07-2015 |
| 2 |
CED/24/15672 IS 5822 : 1994 |
Draft Amendment No. 1 to IS 5822:1994 ‘Code Of Practice for Laying of Electrically Welded Steel Pipes for Water Supply’ (Second Revision) | Amendment | 3 | English | Ready for Gazette | 02-11-2022 |
| 3 |
CED/24/16128 IS 8419 : Part 1 : 1977 |
Amendment No. 1 to IS 8419 (Part 1):1977 'Requirements for filtration equipment: Part 1 Filtration media - Sand and gravel' | Amendment | 3 | English | Manuscritp for editing (with Publication) | 20-08-2020 |
| 4 | CED/24/16883 | Rotationally Moulded Polyethylene Septic Tanks - Specification | New | 3 | English | Ready for Gazette | 18-09-2024 |
| 5 |
CED/24/17497 IS 4127 : 1983 |
Laying of glazed stoneware pipes - Code of practice second revision | Revision | 3 | English | Dropped | 01-11-2021 |
| 6 |
CED/24/17498 IS 8419 : Part 1 : 1977 |
Requirement for filtration equipment: Part 1 Filtration media - Sand and gravel (first revision) | Revision | 3 | English | Dropped | 02-11-2021 |
| 7 |
CED/24/17499 IS 8419 : Part 2 : 1984 |
Requirements for rapid sand gravity filtration equipment: Part 2 Underdrainage system (first revision) | Revision | 3 | English | Dropped | 29-11-2021 |
| 8 |
CED/24/18268 IS 4127 : 1983 |
Laying of Glazed Stoneware Pipes - Code of Practice (Second Revision) | Revision | 3 | English | Ready for Gazette | 18-10-2023 |
| 9 | CED/24/18309 | Sand and gravel for use as filtration medium -Specification | New | 3 | English | Ready for Gazette | 18-10-2023 |
| 10 |
CED/24/18313 IS 8419 : Part 2 : 1984 |
Underdrainage system of rapid sand gravity filtration equipment Requirements (First Revision of IS 8419 (Part 2)) | Revision | 3 | English | Ready for Gazette | 11-08-2023 |
| 11 | CED/24/18330 | Non-sewered on-site sanitation system — Design, Fabrication, and Installation of Biodigesters for Human Waste Decomposition — Code of practice | New | 3 | English | Ready for Gazette | 18-10-2023 |
| 12 | CED/24/24325 | Packaged Sewage Treatment Plant - Specification | New | 3 | English | Ready for Gazette | 18-09-2024 |
| 13 |
CED/24/28224 IS 18797 : 2024 |
Packaged Sewage Treatment Plant — Specification (Draft Amendment No. 1 of IS 18797 : 2024) | Amendment | 3 | English | Ready for Gazette | 03-09-2025 |