| S.No | Document Number | Document Title | Doc Type | Priority | Language | Document Stage | Last Action Date |
|---|---|---|---|---|---|---|---|
| 1 | WRD/22/00578 | Design of diversion works - Criteria : Part 2 Diversion channel and open cut or conduit in the body of dam [( first revision IS 10084(Part 2)] | Revision | 3 | English | Proof to OSA | 01-03-2011 |
| 2 | WRD/22/00580 | Planning and design of guide banks for alluvial rivers - Guidelines ( second revision of IS 10751) | Revision | 3 | English | 15-02-2011 | |
| 3 | WRD/22/00581 | Guidelines for planning and design of rivers embankments ( LEVEES) ( second revision of IS 12094) | Revision | 3 | English | Finalization | 12-08-2016 |
| 4 | WRD/22/00640 | Planning and design of river power houses: Part 2 Design criteria for river power house integrated with barrages (first revision of IS 14592) | Revision | 3 | English | Dropped | 14-05-2021 |
| 5 | WRD/22/00626 | Hydraulic design of narrages amd weirs - Guidelines Part 2 Gravely and bouldery reaches ( AS Part 2 of IS 6966) | Revision | 3 | English | Dropped | 20-11-2021 |
| 6 |
WRD/22/00534 IS 9795 : Part 1: 1981 |
Amendment No.1 to IS 9795(Part 1):1981 | Amendment | 0 | English | Proof to OSA | 07-12-2009 |
| 7 |
WRD/22/00582 IS 14262: 1995 |
Planning and design of revetments - Guidelines | Revision | 3 | English | 01-03-2011 | |
| 8 |
WRD/22/00579 IS 8408: 1994 |
Planning and design of groynes in alluvial river - Guidelines | Revision | 3 | English | Dropped | 29-09-2020 |
| 9 |
WRD/22/10246 IS 12094: 2018 |
Guidelines for Planning and Design of River Embankments Levees Second Revision of IS 12094 | Revision | 1 | English | P-Draft | 03-05-2016 |
| 10 |
WRD/22/10247 IS 12094: 2018 |
Guidelines for Planning and Design of River Embankments Levees | Revision | 3 | English | P-Draft | 03-05-2016 |
| 11 |
WRD/22/10248 IS 12094: 2018 |
Guidelines for Planning and Design of River Embankments Levees | Revision | 3 | English | P-Draft | 03-05-2016 |
| 12 |
WRD/22/10249 IS 12094: 2018 |
Guidelines for Planning and Design of River Embankments Levees | Revision | 3 | English | P-Draft | 03-05-2016 |
| 13 |
WRD/22/10250 IS 12094: 2018 |
Guidelines for Planning and Design of River Embankments Levees | Revision | 3 | English | F-Draft | 03-05-2016 |
| 14 |
WRD/22/10615 IS 12094: 2018 |
WRD 22(581) Guidelines for planning and design of rivers embankments LEVEES second revision of IS 12094 | Revision | 2 | English | Dropped | 08-09-2020 |
| 15 |
WRD/22/14188 IS 10751: 1994 |
Planning and design of guide banks for alluvial rivers guidelines | Revision | 3 | English | Pdf from Department | 20-04-2022 |
| 16 |
WRD/22/22122 IS 14262: 1995 |
PLANNING AND DESIGN OF REVETMENT – GUIDELINES (First Revision of IS 14262) | Revision | 3 | English | Dropped | 12-08-2025 |
| 17 |
WRD/22/22124 IS 12892: 1989 |
SAFETY OF BARRAGE AND WEIR STRUCTURES — GUIDELINES (First Revision of IS 12892) | Revision | 3 | English | Dropped | 12-08-2025 |
| 18 |
WRD/22/22125 IS 11532: 1995 |
CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532 | Revision | 3 | English | Dropped | 12-08-2025 |
| 19 |
WRD/22/28540 IS 14262: 1995 |
PLANNING AND DESIGN OF REVETMENT GUIDELINES | Revision | 3 | English | WC-Draft | 20-08-2025 |
| 20 |
WRD/22/28541 IS 12892: 1989 |
SAFETY OF BARRAGE AND WEIR STRUCTURES GUIDELINES | Revision | 3 | English | WC-Draft | 20-08-2025 |
| 21 |
WRD/22/28542 IS 11532: 1995 |
CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES | Revision | 3 | English | WC-Draft | 20-08-2025 |