Documents(WRD)


S.No Document Number Document Title Doc Type Priority Language Document Stage Last Action Date
1 WRD/14/11673
:
Code of practice for design of tunnels conveying water Part 4 Structural design of concrete lining in rock first revision IS 4880 old Doc No 545 Amendment 3 English Dropped 18-11-2021
2 WRD/14/11993
IS 9761: 1995
Hydropower Intakes - Criteria for Hydraulic Design Amendment - 1 Amendment 3 English Dropped 08-09-2020
3 WRD/14/15243
IS 9761: 1995
Hydropower intakes - Criteria for hydraulic design (First Revision) Amendment - 1 Amendment 3 English Dropped 18-11-2021
4 WRD/14/18184
:
CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK Amendment 3 English Dropped 18-11-2021
5 WRD/14/18185
:
CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK Amendment 3 English Dropped 03-07-2024
6 WRD/14/19357
:
HYDROPOWER INTAKESCRITERIA FOR HYDRAULIC DESIGN Second Revision of IS 9761 Amendment 3 English Dropped 03-07-2024
7 WRD/14/27048
IS 9761: 1995
CRITERIA FOR HYDRAULIC DESIGN OF HYDROPOWER INTAKES GUIDELINES Second Revision of IS 9761 Revision 3 English P-Draft 04-12-2024
8 WRD/14/27491
IS 5878 : Part 1: 1971
CONSTRUCTION OF TUNNELS CONVEYING WATER PART 1 PRECISION SURVEY AND SETTING OUT CODE OF PRACTICE First Revision of IS 5878 Part 1 Revision 3 English WC-Draft 31-01-2025
9 WRD/14/27494
IS 12633: 1989
FIRST FILLING AND EMPTYING OF PRESSURE TUNNELS GUIDELINES First Revision of IS 12633 Revision 3 English WC-Draft 31-01-2025
10 WRD/14/27641
IS 15310: 2003
HYDRAULIC DESIGN OF PUMP SUMPS AND INTAKES GUIDELINES First Revision of IS 15310 Revision 3 English WC-Draft 24-03-2025
11 WRD/14/27793
IS 11639 : Part 3: 1996
CRITERIA FOR STRUCTURAL DESIGN OF PENSTOCK GUIDELINES PART 3 SPECIALS FOR PENSTOCKS First Revision of IS 11639 Part 3 Revision 3 English WC-Draft 19-05-2025