| S.No | Document Number | Document Title | Doc Type | Priority | Language | Document Stage | Last Action Date |
|---|---|---|---|---|---|---|---|
| 1 |
WRD/14/27048 IS 9761: 1995 |
CRITERIA FOR HYDRAULIC DESIGN OF HYDROPOWER INTAKES GUIDELINES Second Revision of IS 9761 | Revision | 3 | English | P-Draft | 04-12-2024 |
| 2 |
WRD/14/27491 IS 5878 : Part 1: 1971 |
CONSTRUCTION OF TUNNELS CONVEYING WATER PART 1 PRECISION SURVEY AND SETTING OUT CODE OF PRACTICE First Revision of IS 5878 Part 1 | Revision | 3 | English | WC-Draft | 31-01-2025 |
| 3 |
WRD/14/27494 IS 12633: 1989 |
FIRST FILLING AND EMPTYING OF PRESSURE TUNNELS GUIDELINES First Revision of IS 12633 | Revision | 3 | English | WC-Draft | 31-01-2025 |
| 4 |
WRD/14/27641 IS 15310: 2003 |
HYDRAULIC DESIGN OF PUMP SUMPS AND INTAKES GUIDELINES First Revision of IS 15310 | Revision | 3 | English | WC-Draft | 24-03-2025 |
| 5 |
WRD/14/27793 IS 11639 : Part 3: 1996 |
CRITERIA FOR STRUCTURAL DESIGN OF PENSTOCK GUIDELINES PART 3 SPECIALS FOR PENSTOCKS First Revision of IS 11639 Part 3 | Revision | 3 | English | WC-Draft | 19-05-2025 |