| S.No | Document Number | Document Title | Doc Type | Priority | Language | Document Stage | Last Action Date |
|---|---|---|---|---|---|---|---|
| 1 |
WRD/16/00660 IS 13073 : Part 2: 2000 |
Amendment No.1 to IS 13073:(Part 2):2000 | Amendment | 3 | English | F-Draft | 27-04-2016 |
| 2 | WRD/16/27379 | Surveillance and Performance Monitoring of Hydraulic Structures - Guidelines | New | 3 | English | P-Draft | 06-02-2025 |
| 3 |
WRD/16/27508 IS 6524: 1972 |
INSTALLATION AND OBSERVATION OF INSTRUMENTS FOR TEMPERATURE MEASUREMENTS INSIDE DAMS - CODE OF PRACTICE: RESISTANCE TYPE THERMOMETERS | Revision | 3 | English | WC-Draft | 06-02-2025 |
| 4 |
WRD/16/27510 : |
DESIGN INSTALLATION OBSERVATION AND MAINTENANCE OF UPLIFT PRESSURE PIPES FOR HYDRAULIC STRUCTURES ON PERMEABLE FOUNDATIONS CODE OF PRACTICE | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 5 |
WRD/16/27511 : |
TYPES OF MEASUREMENTS FOR STRUCTURES IN RIVER VALLEY PROJECTS AND CRITERIA FOR CHOICE AND LOCATION OF MEASURING INSTRUMENTS GUIDELINES PART 1 FOR EARTH AND ROCKFILL DAMS | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 6 |
WRD/16/27512 : |
INSTALLATION MAINTENANCE AND OBSERVATIONS OF PORE PRESSURE MEASURING DEVICES IN CONCRETE AND MASONRY DAMS CODE OF PRACTICE PART I ELECTRICAL RESISTANCE TYPE CELL | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 7 |
WRD/16/27513 : |
INSTALLATION MAINTENANCE AND OBSERVATIONS OF PORE PRESSURE MEASURING DEVICES IN CONCRETE AND MASONRY DAMS CODE OF PRACTICE PART 2 VIBRATING WIRE TYPE CELL | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 8 |
WRD/16/27514 : |
SELECTION SPLICING INSTALLATION AND PROVIDING PROTECTION TO THE OPEN ENDS OF CABLES USED FOR CONNECTING RESISTANCE TYPE MEASURING DEVICES IN CONCRETE AND MASONRY DAMS CODE OF PRACTICE | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 9 |
WRD/16/27515 : |
INSTALLATION MAINTENANCE AND OBSERVATION OF DEFORMATION MEASURING DEVICES IN CONCRETE AND MASONRY DAMS GUIDELINES PART 2 VIBRATING WIRE TYPE JOINTMETER | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 10 |
WRD/16/27516 : |
INSTALLATION MAINTENANCE AND OBSERVATION OF ELECTRICAL STRAIN MEASURING DEVICES IN CONCRETE DAMS CODE OF PRACTICE | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 11 |
WRD/16/27517 : |
INSTRUMENTATION OF BARRAGES AND WEIRS GUIDELINES | Amendment | 3 | English | P-Draft | 06-02-2025 |
| 12 |
WRD/16/27518 : |
INSTALLATION COMMISSIONING AND OBSERVATIONS OF STRESS MEASURING DEVlCES lN CONCRETE AND MASONRY DAMS CODE OF PRACTICE | Amendment | 3 | English | P-Draft | 06-02-2025 |