Name of Department/Committee : CED 43
Document Number : CED 43 ( 12408)
Document Title [English] : Draft Standard for Design and Construction of Machine Foundations - Code of Practice: Part 1 General Provisions Revision of IS 2974Parts 1 to 5
Document Title [Hindi] : मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 1 सामान्य प्रावधान का भारतीय मानक मसौदा [IS 2974 (भाग 1 से 5) का पुनरीक्षण]
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 15-02-2018
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2974 : Part 1: 1982
2 IS 2974 : Part 2: 1980
3 IS 2974 : Part 3: 1992
4 IS 2974 : Part 4: 1979
5 IS 2974 : Part 5: 1987
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : High
Certification : Not Certifiable
Short Commom Man's Title : Machine Foundations
ITCHS Code : NA
Ministry :
  • Ministry of Commerce and Industry
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type: Others :

Sl.No. Synosis Points
1 It covers general provisions relating to design criteria and construction of foundations and structures supporting variety of rotary, reciprocating, impact and other machines associated with various industries.
2 This is Part 1 of IS 2974 which is being revised in 8 Parts. The first 5 Parts would be brought out in first phase, and the remaining 3 in the second phase.
3 The general provisions applicable to all types of machine foundations, such as general terminology, machine types, foundation types, load data, general load combinations, soil dynamics investigation outlines, geotechnical data, machine parameters/data, general construction requirements, observations after commissioning of the equipment, permissible amplitude of vibrations, etc are covered in this Part.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 15-03-2018 25-08-2020 15-10-2021 31-12-2021 MADHURIMA MADHAV 17-05-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 15-02-2018 -------
2 P-Draft 16-02-2018 Duration : Days
Remarks : Updated from backend on 17-08-2020 as the same was not uploaded by MS in the module, requested received from CED vide email 17-08-2020
CED 43, -------
3 WC Draft 17-08-2020 Stage changed from backend -------
4 Skipped to W-Draft 17-08-2020 Stage-Changed -------
5 WC Draft 18-08-2020 Covering letter generated -------
6 WC Draft 18-08-2020 Covering letter generated -------
7 WC Draft 18-08-2020 Covering letter generated -------
8 WC Draft 18-08-2020 Duration : 58 Days
Submitted for HOD approval
-------
9 WC Draft 18-08-2020 WC approved by HOD
CEDC   -------