Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 13264)
Document Title [English] : Design and construction of machine foundations ― Code of practice: Part 3 Frame foundations [Revision of IS 2974 (Parts 1 to 5)]
Document Title [Hindi] : मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 3 फ्रेम नींव [IS 2974 (भाग 1 से 5) का पुनरीक्षण]
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 14-11-2018
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2974 : Part 3: 1992
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : High
Certification : Not Certifiable
Short Commom Man's Title : Machine Foundations
ITCHS Code : NA
Ministry :
  • Ministry of Commerce and Industry
  • Ministry of Heavy Industries and Public Enterprises
  • Ministry of Housing and Urban Affairs
  • Ministry of Chemicals and Fertilizers
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 It covers design and construction of framed type foundations of reinforced cement concrete (RCC) and/or structural steel supporting various kinds of rotary and reciprocating machines.
2 This Part 3 of IS 2974 is being revised in eight parts, first five being brought out in the first phase and remaining three parts in subsequent phase.
3 This Part has to be read along with the draft for Part 1 of IS 2974 which covers general provisions for all types of machine foundations. The draft for Part 1 is available on BIS website for comments.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-12-2018 25-08-2020 15-10-2021 31-12-2021 MADHURIMA MADHAV 17-05-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 14-11-2018 -------
2 P-Draft 26-11-2018 Duration : Days
Remarks : Updated from backend on 17-08-2020 as the same was not uploaded by MS in the module, requested received from CED vide email 17-08-2020
CED 43, -------
3 WC Draft 17-08-2020 Stage changed from backend -------
4 Skipped to W-Draft 17-08-2020 Stage-Changed -------
5 WC Draft 18-08-2020 Covering letter generated -------
6 WC Draft 18-08-2020 Duration : 58 Days
Submitted for HOD approval
-------
7 WC Draft 18-08-2020 WC approved by HOD
CEDC   -------
8 WC-Draft 24-08-2020 WC-Draft Email Notifications Sent CEDC, CED 43, MED 0, CED 43 : P8, -------