Name of Department/Committee : | CED 43 | ||||
---|---|---|---|---|---|
Document Number : | CED 43 ( 13264) | ||||
Document Title [English] : | Design and construction of machine foundations ― Code of practice: Part 3 Frame foundations [Revision of IS 2974 (Parts 1 to 5)] | ||||
Document Title [Hindi] : | मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 3 फ्रेम नींव [IS 2974 (भाग 1 से 5) का पुनरीक्षण] | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.020 | ||||
Date of Project Approval : | 14-11-2018 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Foundation Engineering |
Aspects : | Code of Practice |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | Machine Foundations |
ITCHS Code : | NA |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | It covers design and construction of framed type foundations of reinforced cement concrete (RCC) and/or structural steel supporting various kinds of rotary and reciprocating machines. | |
2 | This Part 3 of IS 2974 is being revised in eight parts, first five being brought out in the first phase and remaining three parts in subsequent phase. | |
3 | This Part has to be read along with the draft for Part 1 of IS 2974 which covers general provisions for all types of machine foundations. The draft for Part 1 is available on BIS website for comments. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 14-11-2018 | ------- | ||
2 | P-Draft | 26-11-2018 | Duration : Days Remarks : Updated from backend on 17-08-2020 as the same was not uploaded by MS in the module, requested received from CED vide email 17-08-2020 |
CED 43, | ------- |
3 | WC Draft | 17-08-2020 | Stage changed from backend | ------- | |
4 | Skipped to W-Draft | 17-08-2020 | Stage-Changed | ------- | |
5 | WC Draft | 18-08-2020 | Covering letter generated | ------- | |
6 | WC Draft | 18-08-2020 | Duration : 58 Days Submitted for HOD approval |
------- | |
7 | WC Draft | 18-08-2020 | WC approved by HOD |
CEDC | ------- |