Document Details |
|||||
Name of Department/Committee : | CED 43 | ||||
---|---|---|---|---|---|
Document Number : | CED 43 ( 14226) | ||||
Document Title [English] : | Design and Construction of Machine Foundations -Code of Practice: Part 5 Machine Foundations (Excluding Foundations for Hammers and Presses) Supported on Vibration Isolation System (Revision of IS 2974 (Parts 1 to 5 )) | ||||
Document Title [Hindi] : | मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 5 कंपन पृथक्रकरण पर समर्थित (हैमर एवं प्रेसेस के सिवा) मशीनों की नींव [IS 2974 (भाग 1 से 5) का पुनरीक्षण] | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.020 | ||||
Date of Project Approval : | 13-06-2019 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Foundation Engineering |
Aspects : | Code of Practice |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | Foundation for machines |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: | Others : |
Sl.No. | Synosis Points | |
1 | It deals with the design and construction of foundations and structures supporting variety of rotary and reciprocating machines supported on vibration isolation system (VIS) associated various industries. | |
2 | The foundations of hammers and presses on VIS are not covered in this document. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-06-2019 | ------- | ||
2 | P-Draft | 17-06-2019 | Covering letter generated | ------- | |
3 | P-Draft | 18-06-2019 | Covering letter generated | ------- | |
4 | P-Draft | 18-06-2019 | Duration : Days | CED 43, | ------- |
5 | Skipped to W-Draft | 18-06-2021 | Stage-Changed | ------- | |
6 | WC Draft | 18-06-2021 | Duration : 30 Days Submitted for HOD approval |
------- | |
7 | WC Draft | 18-06-2021 | WC approved by HOD |
CEDC CED 02, CED 13, CED 07, CED 37, CED 29, CED 48, MED 28, | ------- |