Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 14226)
Document Title [English] : Design and Construction of Machine Foundations -Code of Practice: Part 5 Machine Foundations (Excluding Foundations for Hammers and Presses) Supported on Vibration Isolation System (Revision of IS 2974 (Parts 1 to 5 ))
Document Title [Hindi] : मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 5 कंपन पृथक्रकरण पर समर्थित (हैमर एवं प्रेसेस के सिवा) मशीनों की नींव [IS 2974 (भाग 1 से 5) का पुनरीक्षण]
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 13-06-2019
Standards to be Revised :
Sl.No. Is No & Year
1 IS 2974 : Part 5: 1987
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : High
Certification : None
Short Commom Man's Title : Foundation for machines
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries and Public Enterprises
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type: Others :

Sl.No. Synosis Points
1 It deals with the design and construction of foundations and structures supporting variety of rotary and reciprocating machines supported on vibration isolation system (VIS) associated various industries.
2 The foundations of hammers and presses on VIS are not covered in this document.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 10-07-2019 15-09-2021 31-12-2021 31-03-2022 MADHURIMA MADHAV 17-05-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-06-2019 -------
2 P-Draft 17-06-2019 Covering letter generated -------
3 P-Draft 18-06-2019 Covering letter generated -------
4 P-Draft 18-06-2019 Duration : Days CED 43, -------
5 Skipped to W-Draft 18-06-2021 Stage-Changed -------
6 WC Draft 18-06-2021 Duration : 30 Days
Submitted for HOD approval
-------
7 WC Draft 18-06-2021 WC approved by HOD
CEDC  CED 02, CED 13, CED 07, CED 37, CED 29, CED 48, MED 28, -------