Document Details
Name of Department/Committee : TED 26
Document Number : TED 26 ( 15008)
Document Title [English] : ROAD VEHICLES — COMPRESSED NATURAL GAS (CNG) / BIO- COMPRESSED NATURAL GAS (BIO- CNG) FUEL SYSTEM COMPONENTS — AUTOMATIC VALVE (SOLENOID VALVE) (First Revision)
Document Title [Hindi] : सड़क वाहन ─ संपीड़ित प्राकृतिक गैस (सीएनजी)/जैव-संपीड़ित प्राकृतिक गैस (जैव-सीएनजी) ईंधन प्रणाली के घटक – स्वचल वाल्व (सोलीनोयड वाल्व) (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 43.060.40
Date of Project Approval : 03-08-2018
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15712: 2006
2 IS 15712: 2006
3 IS 15712: 2006
4 IS 15712: 2006
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15712: 2006


Classification Details
Group : Transport and Related Products
Sub Group : Automobiles and their components
Sub Sub Group : Automotive vehicles, chassis, body fittings and passive safety
Aspects : Methods of tests
Risk : High
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Road Transport and Highways
Sustainable development Goals :
Degree of Equivalence : Modified/Technically Equivalent
Identical/Equivalent Standards : 15500-6
Organization Type: ISO

Sl.No. Synosis Points
1 ROAD VEHICLES COMPRESSED NATURAL GAS (CNG) FUEL SYSTEM COMPONENTS AUTOMATIC VALVE (SOLENOID VALVE)

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-12-2019 25-01-2022 25-02-2022 31-03-2022 Mr. Gaurav Jayaswal 17-11-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 03-08-2018 -------
2 P-Draft 25-11-2019 Covering letter generated -------
3 P-Draft 25-11-2019 Duration : Days TED 26, -------
4 Skipped to W-Draft 10-05-2021 Stage-Changed -------
5 WC Draft 10-05-2021 Duration : 41 Days
Submitted for HOD approval
-------
6 WC Draft 10-05-2021 WC rejected by HOD
Remarks: Please prepare the document as per IS 12
-------
7 WC Draft 19-06-2021 Duration : 60 Days
Submitted for HOD approval
-------
8 WC Draft 21-06-2021 WC rejected by HOD
Remarks: Please make the corrections as discussed.
-------
9 WC Draft 24-12-2021 Duration : 60 Days
Submitted for HOD approval
-------
10 WC Draft 27-12-2021 WC rejected by HOD
Remarks: Please correct the Foreword as discussed.
-------
11 WC Draft 27-12-2022 Duration : 60 Days
Submitted for HOD approval
-------
12 WC Draft 11-01-2023 WC rejected by HOD
Remarks: Please correct the Foreword as discussed.
-------
13 WC Draft 18-05-2023 Duration : 60 Days
Submitted for HOD approval
-------
14 WC Draft 04-06-2023 WC rejected by HOD
Remarks: Please make the necessary corrections
-------
15 WC Draft 16-06-2023 Duration : 60 Days
Submitted for HOD approval
-------
16 WC Draft 28-07-2023 WC rejected by HOD
Remarks: Please make the necessary corrections
-------
17 WC Draft 07-08-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : Corrections have been made as recommended Submitted for kind approval please
-------
18 WC Draft 19-08-2023 WC approved by HOD
TEDC  TED 26, -------