Document Details
Name of Department/Committee : WRD 23
Document Number : WRD 23 ( 16771)
Document Title [English] : Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638
Document Title [Hindi] : यांत्रि साधनों द्वार तटबंध निर्माण की इकाई दर के आवलन के लिए प्रारूप ( दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 18-02-2020
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11638: 2000
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Proforma for analysis of unit rate and Guidelines for estimating cost of the construction equipment and items of work for river valley projects.
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title : construction of embankment by mechanical means
ITCHS Code : embankment
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The major changes incorporated in this second revision of the standard are: a) Relevant taxes and duties, wherever applicable, have been added in calculation of unit rates. b) Provisions for contractors overheads and profits have been indicated. c) Further clarification, where there are separate provisions for dewatering in bill of quantity(BOQ), and d) Provisions to account for swell factor and bulk volume in case of earthwork by machinery has been indicated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-10-2021 22-06-2022 12-09-2022 16-12-2022 SMT. LALTHANPARI 12-05-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-02-2020 -------
2 P-Draft 28-12-2020 Covering letter generated -------
3 P-Draft 28-12-2020 Duration : 30 Days WRD 23, -------
4 Skipped to W-Draft 10-03-2022 Stage-Changed -------
5 WC Draft 10-03-2022 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 15-03-2022 WC approved by HOD
WRDC  WRD 23, -------