Document Details
Name of Department/Committee : WRD 23
Document Number : WRD 23 ( 16772)
Document Title [English] : Proforma for analysis of unit rate of grouting first revision of IS 13418
Document Title [Hindi] : ग्राउटिंग की इकाई दर के विशलेषण के लिए प्रोफार्मा ( आई एस 13418 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 18-02-2020
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13418: 1992
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Proforma for analysis of unit rate and Guidelines for estimating cost of the construction equipment and items of work for river valley projects.
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : unit rate of grouting
ITCHS Code : unitrate
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard was first published in 1992. The first revision of this standard has been brought out to bring the standard in sync with the latest field practices observed while using the standard and to bring it in the latest style and format of the Indian Standards. The major changes incorporated in this revision of the standard are: a) Relevant taxes and duties, wherever applicable, have been added in calculation of unit rates. b) Provisions for contractor’s overheads and profits have been indicated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-10-2021 22-06-2022 12-09-2022 16-12-2022 SMT. LALTHANPARI 12-05-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-02-2020 -------
2 P-Draft 28-12-2020 Covering letter generated -------
3 P-Draft 28-12-2020 Duration : 30 Days WRD 23, -------
4 Skipped to W-Draft 20-05-2022 Stage-Changed -------
5 WC Draft 20-05-2022 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 23-05-2022 WC approved by HOD
WRDC  WRD 23, -------