Document Details |
|||||
Name of Department/Committee : | ETD 15 | ||||
---|---|---|---|---|---|
Document Number : | ETD 15 ( 17922) | ||||
Document Title [English] : | LINE OPERATED A.C. MOTORS FOR SUBMERSIBLE PUMPSETS-SPECIFICATION (THIRD REVISION) | ||||
Document Title [Hindi] : | निमज्जन पम्प सेटों के लिए मोटरें- विशिष्टि (तृतीया पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 29.160.30 | ||||
Date of Project Approval : | 15-06-2021 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Motors, Winding Wires and Accessories |
Sub Sub Group : | Motors, Generators & Turbines |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Motors for submersible pumpsets |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard specifies technical requirements of submersible motors for submersible pumpsets. In this revision the following have been added: a) Values of Performance Characteristics for 2-Pole Three-Phase Submersible Motor — Oil Filled (Suitable for Bore Size 150 mm and Maximum outside Diameter of Motor 146 mm) b) Three efficiency levels for 2-Pole Three-Phase Submersible Motors (all performance characteristics tables |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 15-06-2021 | ------- | ||
2 | P-Draft | 18-08-2021 | Covering letter generated | ------- | |
3 | P-Draft | 18-08-2021 | Duration : 30 Days | ETD 15, | ------- |
4 | Skipped to W-Draft | 07-07-2023 | Stage-Changed | ------- | |
5 | WC Draft | 07-07-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 07-07-2023 | WC approved by HOD |
ETDC MED 20, | ------- |
7 | WC Draft | 01-05-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Committee decided on 22 March 2024 meeting to correct the document and then wide circulate again |
------- | |
8 | WC Draft | 01-05-2024 | WC approved by HOD |
ETDC MED 20, | ------- |