Name of Department/Committee : CED 39
Document Number : CED 39 ( 18804)
Document Title [English] : CRITERIA FOR EARTHQUAKE RESISTANT DESIGN OF STRUCTURES IS 1893 Part 7 : PIPELINES
Document Title [Hindi] : संरचनाओं के भूकम्परोधी डिज़ाइन के मानदंड भाग ७ पाइपलाइन्स
Document Type : New
Language : English
Priority : 3
ICS Code : 91.120.25
Date of Project Approval : 29-07-2021
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Safety of structures
Sub Sub Group : Earthquake Resistant & Blast Resistant design
Aspects : Code of Practice
Risk : High
Certification : None
Short Commom Man's Title : Earthquake Resistant Design of Pipelines
ITCHS Code :
Ministry :
  • Ministry of Home Affairs
  • Ministry of Petroleum and Natural Gas
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Pipelines are considered as lifeline structures and are mainly used for transporting commodities over long distances. Since they traverse over a large geographical area, they may get damaged during earthquakes disrupting the supply of material, leakage of product, the breakout of fire, etc., which can lead to significant financial and environmental impact. A large part of the land area of India is prone to moderate to severe earthquake shaking, and pipelines built in these areas may encounter various seismic hazards en route. Therefore, the seismic design of the pipeline has great importance in the field of lifeline engineering.
2 The pipelines are usually buried below ground for economic, aesthetic, safety, and environmental reasons. These are normally termed buried pipelines. In certain circumstances, it may also be required to take the pipelines above ground, which are termed as above-ground pipelines. This standard provides guidance to design both buried and above-ground pipelines subjected to various seismic hazards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-05-2022 02-02-2023 17-06-2023 17-01-2024 S ARUN KUMAR 18-01-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-07-2021 -------
2 P-Draft 18-01-2022 Covering letter generated -------
3 P-Draft 18-01-2022 Duration : 14 Days CED 39, -------
4 P-Draft 14-12-2022 Covering letter generated -------
5 P-Draft 14-12-2022 Duration : 14 Days
Remarks : Revised Preliminary Draft of IS 1893 Part 7 on Pipelines based on revised seismic hazard
CED 39, -------
6 Skipped to W-Draft 08-02-2024 Stage-Changed -------
7 WC Draft 08-02-2024 Duration : 30 Days
Submitted for HOD approval
-------
8 WC Draft 09-02-2024 WC rejected by HOD
Remarks: as discussed the corrections be made wrt IS 12 and resubmitted
-------
9 WC Draft 09-02-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Proposed suggestions have been incorporated
-------
10 WC Draft 09-02-2024 WC approved by HOD