Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 18859)
Document Title [English] : Design and Construction of Radar and Satellite Tracking Antennas Microwave Mobile and Television Tower Foundations Code of Practice (First Revision of IS 11233)
Document Title [Hindi] : रडार और सैटेलाइट ट्रैकिंग एंटेना एवं माइक्रोवेव, मोबाइल और टेलीविजन टॉवर के नींव का डिजाइन और निर्माण — रीति संहिता (आईएस 11233 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 20-08-2019
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11233: 1985
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11233: 1985


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : High
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code : NA
Ministry :
  • Ministry of Commerce and Industry
  • Ministry of Heavy Industries and Public Enterprises
  • Ministry of Housing and Urban Affairs
  • Ministry of Chemicals and Fertilizers
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 New terms and their definitions have been incorporated. Some of the existing definitions have also been modified.
2 The scope of the standard has been extended to cover foundations of mobile communication towers and satellite tracking antennas. Title of the standard has been accordingly modified
3 The provisions on necessary information to be provided for design and construction of foundations have been modified.
4 Provisions relating to design, construction and materials have also been modified.
5 Provisions on foundation drawings and anchor bolt template have been included.
6 Block foundations are included, for those superstructures transmitting vibrations from superstructure to the foundation.
7 Uncertainty analysis for estimating settlements in soft soil, has been incorporated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-06-2022 17-02-2023 02-07-2023 02-02-2024 MADHURIMA MADHAV 02-02-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 20-08-2019 -------
2 P-Draft Waived 09-02-2022 Decided by the Committee to directly issue in wide circulation. -------
3 WC Draft 09-02-2022 Duration : 35 Days
Submitted for HOD approval
-------
4 WC Draft 09-02-2022 WC approved by HOD
CEDC  CED 43, -------