Document Details
Name of Department/Committee : WRD 14
Document Number : WRD 14 ( 18185)
Document Title [English] : CODE OF PRACTICE FOR DESIGN OF TUNNELS CONVEYING WATER PART 4 STRUCTURAL DESIGN OF CONCRETE LINING IN ROCK
Document Title [Hindi] : पानी पहुंचाने वाली सुरंगों के डिजाइन के लिए रीति संहिता भाग 4 चट्टान में कंक्रीट अस्तर की संरचनात्मक डिजाइन
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 15-09-2021
Standards to be Revised :
Sl.No. Is No & Year
1 IS 4880 : Part 4: 1971
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 4880 : Part 4: 1971


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Water Conductor Systems
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title : Design of Concrete Lining in Tunnels
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 a) Criteria for depth of the grout holes is modified in pressure grouting. b) Fig. 1 which shows typical section of concrete lined tunnel showing A-line and B-line has been updated. c) Structural steel has been omitted from definition of minimum excavation line (A-line) d) Criteria for backfill grouting has been updated. e) Criteria for design for external water pressure has been updated

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 08-02-2022 23-10-2022 10-03-2023 10-10-2023 DUSHYANT PRAJAPATI 08-10-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 15-09-2021 -------
2 P-Draft 11-10-2021 Covering letter generated -------
3 P-Draft 11-10-2021 Duration : 30 Days WRD 14, -------
4 Skipped to W-Draft 20-10-2022 Stage-Changed -------
5 WC Draft 20-10-2022 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 20-10-2022 WC rejected by HOD
Remarks: EDITORIAL
-------
7 WC Draft 20-10-2022 Duration : 60 Days
Submitted for HOD approval
-------
8 WC Draft 20-10-2022 WC approved by HOD
WRDC  WRD 14, -------