Document Details
Name of Department/Committee : TED 26
Document Number : TED 26 ( 18380)
Document Title [English] : ROAD VEHICLES — COMPRESSED NATURAL GAS (CNG) / BIO- COMPRESSED NATURAL GAS (BIO - CNG) FUEL SYSTEM COMPONENTS — FLEXIBLE FUEL LINE WITH END CONNECTIONS [CNG FUEL LINE HAVING PRESSURE NOT EXCEEDING 2.15MPa (21.5 BAR)] (First Revision)
Document Title [Hindi] : सड़क वाहन – संपीड़ित प्राकृतिक गैस (सीएनजी)/जैव-संपीड़ित प्राकृतिक गैस (जैव-सीएनजी) ईंधन प्रणाली के घटक – सिरे कनेक्शन सहित सीएनजी निम्न दाब नम्य ईंधन लाईन [2.15 मैगापास्कल (21.5 बार) से कम दाब की सीएनजी ईंधन लाईन]
Document Type : Revision
Language : English
Priority : 3
ICS Code : 43.060.40
Date of Project Approval : 11-11-2021
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15722: 2006
2 IS 15722: 2006
Standards to be Superseded :


Classification Details
Group : Pumps, Engines and Compressors
Sub Group : Engines and Generators
Sub Sub Group : Road Vehicles(CNG)
Aspects : Others
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Road Transport and Highways
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 1.1 This draft standard specifies definitions, test methods and requirements of CNG / Bio- CNG flexible fuel line with end connection of CNG / Bio- CNG onboard fuel system component having service pressure not exceeding 2.15 MPa (21.5 Bar), intended for use on motor vehicles defined in IS 14272.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 11-03-2022 26-11-2022 10-04-2023 10-11-2023 Mr. Gaurav Jayaswal 11-11-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 11-11-2021 -------
2 P-Draft 18-04-2022 Covering letter generated -------
3 P-Draft 18-04-2022 Duration : 60 Days TED 26, -------
4 Skipped to W-Draft 19-05-2023 Stage-Changed -------
5 WC Draft 22-05-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 04-06-2023 WC rejected by HOD
Remarks: Please make the necessary corrections
-------
7 WC Draft 20-06-2023 Duration : 60 Days
Submitted for HOD approval
-------
8 WC Draft 01-08-2023 WC rejected by HOD
Remarks: Please make the necessary corrections as discussed
-------
9 WC Draft 07-08-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : Corrections have been made as recommended Submitted for kind approval please
-------
10 WC Draft 19-08-2023 WC approved by HOD
TEDC  TED 26, -------