Document Details
Name of Department/Committee : WRD 05
Document Number : WRD 05 ( 19982)
Document Title [English] : GEOLOGICAL EXPLORATION FOR RESERVOIR SITES GUIDELINES (FIRST REVISION)
Document Title [Hindi] : जलाशय स्थलों के ललए भूवैज्ञाननक अन्वेषण
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 28-06-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13216: 1991
2 IS 13216: 1991
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13216: 1991


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects
Aspects : Others
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This first revision of the standard has been brought out to bring it in the latest style and format of the Indian Standards. Subsequent upon revision of IS 10711, the standard has been further modified with respect to referred map scale.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-10-2022 13-07-2023 28-11-2023 28-06-2024 DUSHYANT PRAJAPATI 28-06-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-06-2022 -------
2 P-Draft 28-06-2022 Covering letter generated -------
3 P-Draft 28-06-2022 Duration : 30 Days WRD 5, WRD 05,  -------
4 Skipped to W-Draft 28-09-2022 Stage-Changed -------
5 WC Draft 28-09-2022 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 28-09-2022 WC approved by HOD
WRDC  WRD 05, -------