Document Details |
|||||
Name of Department/Committee : | CHD 19 | ||||
---|---|---|---|---|---|
Document Number : | CHD 19 ( 19016) | ||||
Document Title [English] : | PERSONAL PROTECTIVE EQUIPMENT PART 4 OCCUPATIONAL FOOTWEAR Third Revision | ||||
Document Title [Hindi] : | निजी सुरक्षा उपस्कर भाग 4 व्यवसाय में पहनने के फुटवियर (तीसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 13.340.50 | ||||
Date of Project Approval : | 21-12-2021 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Leather and Leather Products |
Sub Group : | Footwear and Accessories (including PVC footwear) |
Sub Sub Group : | Safety footwear |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Mandatory Certification |
Short Commom Man's Title : | PERSONAL PROTECTIVE EQUIPMENT PART 4 OCCUPATIONAL FOOTWEAR |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 20347: 2021 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies basic and additional (optional) requirements for occupational footwear used for general purpose. It includes, for example, mechanical risks, slip resistance, thermal risks, ergonomic behaviour. It also specifies requirements for occupational footwear equipped with customized insocks, customized occupational footwear or individual manufactured customized occupational footwear. This standard does not cover the property of high visibility because of interaction with the clothing (e.g. trousers cover the footwear) and work area conditions (e.g. dirt, mud). Special risks are covered by complementary job-related standards (e.g. footwear for firefighters, electrical insulating footwear, protection against chain saw injuries, protection against chemicals and against molten metal splash, protection for motorcycle riders). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-12-2021 | ------- | ||
2 | P-Draft | 02-03-2022 | Covering letter generated | ------- | |
3 | P-Draft | 02-03-2022 | Duration : 21 Days | CHD 19, CHD 19, | ------- |
4 | Skipped to W-Draft | 22-03-2023 | Stage-Changed | ------- | |
5 | WC Draft | 22-03-2023 | Duration : 30 Days Submitted for HOD approval Remarks : The document is being sent into Wide circulation for 30 days with the chairman approval |
------- | |
6 | WC Draft | 27-03-2023 | WC approved by HOD |
CHDC CHD 19, | ------- |
7 | WC Draft | 15-03-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The Committee during the 43rd meeting of CHD 19 held on 13th Feb 2024 decided to send the document into 1 month WC |
------- | |
8 | WC Draft | 15-03-2024 | WC rejected by HOD Remarks: Please review the Foreword |
------- | |
9 | WC Draft | 15-03-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
10 | WC Draft | 15-03-2024 | WC rejected by HOD Remarks: Please discuss |
------- | |
11 | WC Draft | 18-03-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The Committee during the 43rd meeting of CHD 19 held on 13th Feb 2024 decided to send the document into 1 month WC |
------- | |
12 | WC Draft | 20-03-2024 | WC approved by HOD |
CHDC CHD 19, | ------- |