Document Details
Name of Department/Committee : CHD 08
Document Number : CHD 08 ( 19051)
Document Title [English] : Respiratory protective devices full - Face masks - Specification First Revision
Document Title [Hindi] : पूर्ण श्वसन सुरक्षात्मक उपकरण - फेस मास्क - विशिष्टता
Document Type : Revision
Language : English
Priority : 2
ICS Code : 13.340.30
Date of Project Approval : 23-12-2021
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14166: 1994
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14166: 1994


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Occupational Health and Safety Protection
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Labour and Employment
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 In this first revision, the following major changes have been made: a) Escape application for full face mask is included; b) Classification (class 1, 2, and 3) introduced based on area of application; c) Tolerances for specified requirements defined and testing conditions specified; d) Materials requirement specific for class 2 and class 3; e) Test method for differential pressure testing of speech diaphragm added; f) New parameter introduced – Leak tightness; g) Flammability test method is different for different classes; h) Strength of head harness requirement different for classes; j) Facepiece connector and threading requirements different for classes; k) Vision test using apertometer done away with for field of vision; m) Tensile force requirement different for different classes; n) Breathing resistance requirement different for different classes and threading of mask; p) Requirement for resistance to thermal radiation introduced for class 3 masks; q) Identification marking given

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-06-2022 04-03-2023 19-03-2023 03-09-2023 SHRI SUSHANT KUMAR 19-03-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 23-12-2021 -------
2 P-Draft 08-03-2022 Covering letter generated -------
3 P-Draft 08-03-2022 Duration : 21 Days
Remarks : The committee decided to circulate the draft as P-draft for 21 days to committee members The comments received on it would be sent to SC 3 for making their recommendations and updating the draft
CHD 8, -------
4 Skipped to W-Draft 19-03-2024 Stage-Changed -------
5 WC Draft 19-03-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : The Sectional Committee CHD 08 in its 24th meeting had decided to send the document for wide circulation for a period of 60 days Kindly approve
-------
6 WC Draft 22-03-2024 WC approved by HOD
CHDC   -------