Document Details
Name of Department/Committee : CHD 35
Document Number : CHD 35 ( 19220)
Document Title [English] : IS 5182PART 27 METHODS FOR MEASUREMENT OF AIR POLLUTION PART 27 Vapour-phase organic chemicals vinyl chloride to nC22 hydrocarbons in air and gaseous emissions by diffusive passive sampling onto sorbent tubes or followed by thermal desorption TD a
Document Title [Hindi] : वायु प्रदुषण के मापन ने की विधि भाग 27 वाष्प-चरण कार्बनिक रसायन विनाइल क्लोराइड से nC22 वायु और गैसीय उत्सर्जन में हाइड्रोकार्बन - थर्मल डिसोर्शन (टीडी) और केपिलरी गैस क्रोमैटोग्राफी (जीसी) विश्लेषण के बाद सॉर्बेंट ट्यूब या कार्ट्रिज पर डिफ्यूसिव (नि
Document Type : New
Language : English
Priority : 3
ICS Code : 13.040.20
Date of Project Approval : 31-08-2021
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Methods of Measurement of air pollution
Aspects : Methods of tests
Risk : Low
Certification : None
Short Commom Man's Title : Methods of measurement of air pollution
ITCHS Code :
Ministry :
  • Ministry of Environment and Forests
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This method is applicable to measuring the vapour-fraction of target GC-compatible organic compounds in ambient, indoor and workplace air. Compatible compounds range in volatility from vinyl chloride to nC22 hydrocarbons at concentrations ranging from low micrograms per cubic metre (low ng/l) to milligrams per cubic metre (high µg/l).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 28-07-2022 12-04-2023 27-08-2023 27-03-2024 MS. PREETI PRABHA 28-03-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 31-08-2021 -------
2 P-Draft 29-03-2022 Covering letter generated -------
3 P-Draft 29-03-2022 Duration : 21 Days
Remarks : The committee decided to circulate the document as preliminary draft for 21 days during the 11th meeting of CHD 35
CHD 35, CHD 35,  -------
4 Skipped to W-Draft 03-07-2023 Stage-Changed -------
5 WC Draft 03-07-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 04-07-2023 WC rejected by HOD
Remarks: Please discuss.
-------
7 WC Draft 23-10-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Committee decided to send the document into WC for 60 days during 15th meeting of CHD 35
-------
8 WC Draft 23-10-2023 WC approved by HOD
CHDC   -------
9 WC Draft 23-10-2023 WC approved by HOD
CHDC   -------