Document Details |
|||||
Name of Department/Committee : | MED 07 | ||||
---|---|---|---|---|---|
Document Number : | MED 07 ( 19316) | ||||
Document Title [English] : | DATA SHEET FOR DESIGN SELECTION OF VACUUM PRODUCER | ||||
Document Title [Hindi] : | वैक्यूम प्रोड्यूसर के डिजाइन/चयन के लिए आंकड़ा पत्र | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 53.040 | ||||
Date of Project Approval : | 07-04-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Non-powered material handling equipment |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
Sl. No. | Document No | Document Title | |
::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) :: |
|||||||||||||
Sl. No. | Prefix | Number | Part | Section | Year | ||||||||
Sl.No. | Synosis Points | |
1 | It lays down the data required for design/selection of vacuum producers. This Indian Standard lays down the data required for the selection/design of ejectors. This data sheet may be used by manufacturer and purchaser alike for giving details of the equipment manufactured by manufacturer or required by purchaser to the purchaser/manufacturer. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 07-04-2022 | ------- | ||
2 | P-Draft Waived | 27-10-2022 | ------- | ||
3 | WC Draft | 27-10-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 01-11-2022 | WC rejected by HOD Remarks: Please Check. |
------- | |
5 | WC Draft | 17-11-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 17-11-2022 | WC approved by HOD |
MEDC | ------- |
7 | Skipped to Finalization | 27-12-2024 | Stage-Changed | ------- | |
8 | Finalization | 20-12-2024 | ------ | ------- | |
9 | Final Draft | 27-12-2024 | Submited for HOD approval Remarks: HMED may consider and approve |
------- | |
10 | Final Draft Rejected by HOD | 31-12-2024 | Final Draft rejected by HOD Remarks: upload correct document |
------- | |
11 | Final Draft | 31-12-2024 | Submited for HOD approval Remarks: HMED may consider and approve |
------- | |
12 | Final Draft draft accepted by HOD and sent to Publication | 01-01-2025 | Final Draft approved by HOD | ------- | |
13 | Final Draft | 06-01-2025 | Final Draft rejected by Publication Remarks: Hindi title mismatch in document details mentioned on portal and that in F draft. English title should be the same as per the document. |
------- | |
14 | Final Draft | 09-01-2025 | Submited for HOD approval Remarks: The corrections have been made in the document as per the suggestion of the publication department HMED may kindly consider and approve |
------- | |
15 | Final Draft draft accepted by HOD and sent to Publication | 09-01-2025 | Final Draft approved by HOD | ------- | |
16 | Accepted by Publication | 10-01-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
17 | Proof sent to Technical Department | 17-01-2025 | प्रथम एडिटिड कॉपी सलग्न है और डॉक्यूमेंट में दिए गए कमेंट्स का उत्तर दीजीएगा। | ------- | |
18 | Proof sent to Publication | 21-01-2025 | The reply of the comments have been added, kindly proceed the document. | ------- |