Document Details |
|
Name of Department/Committee : | MTD 15 |
---|---|
Document Number : | MTD 15 ( 20724) |
IS Number (Technical Department) : | IS 1528 : Part 1: 2010 |
Document Title [English] : | Methods of sampling and physical tests for refractory materials: Part 1 determination of pyrometric cone equivalent (PCE) or softening point (Third Revision) Amendment - 2 |
Document Title [Hindi] : | उषà¥à¤®à¤¾à¤¸à¤¹ सामगà¥à¤°à¤¿à¤¯à¥‹à¤‚ के नमूनें लेने की और à¤à¥Œà¤¤à¤¿à¤• परिकà¥à¤·à¤£ पदà¥à¤§à¤¤à¤¿à¤¯à¤¾à¤ : à¤à¤¾à¤— 1 उतà¥à¤¤à¥à¤¤lपमिति शंकॠसमतà¥à¤²à¥à¤¯ (पी सी ई) या गलन बिंदॠका निरà¥à¤§à¤¾à¤°à¤£ (तीसरा पà¥à¤¨à¤°à¥€à¤•à¥à¤·à¤£) ( दूसरा संशोधन) |
Document Type : | Amendment |
Amendment No : | 3 |
Language : | English |
Priority : | 2 |
ICS Code : | |
Date of Project Approval : | 24-12-2021 |
Standards to be Superseded : |
Division Council Chairperson Approval Details |
|||||||||||
|
Sl.No. | Synosis Points | |
1 | The new figure for pyrometric reference test cone as per ASTM 24 has been added | |
2 | Table from IS 12893/ISO 1146 has been included in the Amendment which gives the details on Summary of Reference Temperatures and Cone Designations of ISO, Segar, Orton and H.P.C Pyrometric Reference Cones | |
3 |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 24-12-2021 | ------- | ||
2 | P-Draft Waived | 21-11-2022 | ------- | ||
3 | WC Draft | 21-11-2022 | Duration : 33 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 21-11-2022 | WC approved by HOD |
MTDC | ------- |
5 | Skipped to Finalization | 06-01-2023 | Stage-Changed | ------- | |
6 | Finalization | 04-01-2023 | CHAIRPERSON APPROVAL ACCORDED VIDE EMAIL DATED 4January 2023 | ------- | |
7 | Final Draft | 06-01-2023 | Submited for HOD approval Remarks: DRAWINGS ARE ATTACHED HEREWITH AND THE SAME HAVE BEEN INCORPORATED IN THE STANDARD |
------- | |
8 | Final Draft draft accepted by HOD and sent to Publication | 09-01-2023 | Final Draft approved by HOD | ------- | |
9 | Accepted by Publication | 19-01-2023 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
10 | Proof sent by OSA to Publication | 20-01-2023 | Proof to OSA Stage-Skipped | ------- | |
11 | Skipped to Pdf Stage | 20-01-2023 | Proof to Technial Department Stage-Skipped | ------- | |
12 | Stage-Skipped | 20-01-2023 | PDF to OSA Stage-Skipped | ------- | |
13 | Pdf sent by Publication to Technical Department | 20-01-2023 | PDF attached for chairperson approval. Please check and revert back if any correction is required. | ------- | |
14 | Pdf sent by Technical Department to Publication | 30-01-2023 | The PDF is correct and DC chair approval has been uploaded | ------- | |
15 | Ready for Gazette | 09-02-2023 | Stage-Changed | ------- |