Document Details
Name of Department/Committee : MTD 15
Document Number : MTD 15 ( 20724)
IS Number (Technical Department) : IS 1528 : Part 1: 2010
Document Title [English] : Methods of sampling and physical tests for refractory materials: Part 1 determination of pyrometric cone equivalent (PCE) or softening point (Third Revision) Amendment - 2
Document Title [Hindi] : उष्मासह सामग्रियों के नमूनें लेने की और भौतिक परिक्षण पद्धतियाँ : भाग 1 उत्त्तlपमिति शंकु समतुल्य (पी सी ई) या गलन बिंदु का निर्धारण (तीसरा पुनरीक्षण) ( दूसरा संशोधन)
Document Type : Amendment
Amendment No : 3
Language : English
Priority : 2
ICS Code :
Date of Project Approval : 24-12-2021
Standards to be Superseded :

Division Council Chairperson Approval Details
Request Date: 30-01-2023
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Amit Bhattacharjee
Attachment :  View
Sectional Committee Chairman Approval :
N/A


Sl.No. Synosis Points
1 The new figure for pyrometric reference test cone as per ASTM 24 has been added
2 Table from IS 12893/ISO 1146 has been included in the Amendment which gives the details on Summary of Reference Temperatures and Cone Designations of ISO, Segar, Orton and H.P.C Pyrometric Reference Cones
3

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-10-2022 12-01-2023 12-02-2023 12-04-2023 Mr. SAAQIB RAAHI 12-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-12-2021 -------
2 P-Draft Waived 21-11-2022 -------
3 WC Draft 21-11-2022 Duration : 33 Days
Submitted for HOD approval
-------
4 WC Draft 21-11-2022 WC approved by HOD
MTDC   -------
5 Skipped to Finalization 06-01-2023 Stage-Changed -------
6 Finalization 04-01-2023 CHAIRPERSON APPROVAL ACCORDED VIDE EMAIL DATED 4January 2023 -------
7 Final Draft 06-01-2023 Submited for HOD approval

Remarks: DRAWINGS ARE ATTACHED HEREWITH AND THE SAME HAVE BEEN INCORPORATED IN THE STANDARD
-------
8 Final Draft draft accepted by HOD and sent to Publication 09-01-2023 Final Draft approved by HOD -------
9 Accepted by Publication 19-01-2023 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
10 Proof sent by OSA to Publication 20-01-2023 Proof to OSA Stage-Skipped -------
11 Skipped to Pdf Stage 20-01-2023 Proof to Technial Department Stage-Skipped -------
12 Stage-Skipped 20-01-2023 PDF to OSA Stage-Skipped -------
13 Pdf sent by Publication to Technical Department 20-01-2023 PDF attached for chairperson approval. Please check and revert back if any correction is required. -------
14 Pdf sent by Technical Department to Publication 30-01-2023 The PDF is correct and DC chair approval has been uploaded -------
15 Ready for Gazette 09-02-2023 Stage-Changed -------