Document Details |
|||||
Name of Department/Committee : | CHD 34 | ||||
---|---|---|---|---|---|
Document Number : | CHD 34 ( 20733) | ||||
Document Title [English] : | GREENHOUSE GASES Part 3 Specification with Guidance for the Validation And Verification of Greenhouse Gas Assertions First Revision | ||||
Document Title [Hindi] : | ग्रीनहाउस गैसें भाग 3 ग्रीनहाउस गैस के प्रभावन के वैधीकरण और सत्यापन की दिशा-निर्देश सहित विशिष्टि (पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 13.020.40 | ||||
Date of Project Approval : | 29-07-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Environment management |
Sub Sub Group : | Environmental Management |
Aspects : | System Standard |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | Specification with Guidance for the Validation And Verification of Greenhouse Gas Assertions |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | ISO 14064-3: 2019 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | The major changes in this revision as compared to the previous edition are as follows: a) The structure of the document has been changed so that verification and validation are discussed in sequence (see Clauses 6 and 7) rather than in parallel because the processes of verification and validation are significantly different. b) The definitions of verification and validation and other key terms have been changed (see Clause 3). c) A new section on validation has been added (see Clause 7). It applies to future estimates of emissions, removals, emission reductions, and removal enhancements. The purpose of validation is to provide assurance on the assumptions, limitations, and methods used to develop a GHG statement. d) A new Annex A has been added that defines requirements for verifiers to follow when undertaking engagements at a limited level of assurance. e) A new Annex B has been added to considerations for verification. | |
2 | f) A new Annex C has been added to a new process called agreed-upon procedures (AUP), which allows for a selection of verification activities to be performed and reported upon. No opinion is expressed on the result of an AUP engagement as the intended user(s) are responsible for interpreting the information reported on by the verifier. g) A new Annex D has been added that provides guidance on how verifiers and validators can provide statements on engagements that are mixed. h) Requirements and guidance on the use of levels of assurance have been added. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 29-07-2022 | ------- | ||
2 | P-Draft Waived | 17-10-2022 | The CHD 34 committee in its 27th meeting decided to circulate the National Forward as wide circulation. | ------- | |
3 | WC Draft | 17-10-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 26-10-2022 | WC approved by HOD |
CHDC | ------- |