Document Details
Name of Department/Committee : CHD 10
Document Number : CHD 10 ( 20878)
Document Title [English] : LIMESTONE AND DOLOMITE FOR GLASS AND CERAMIC INDUSTRY - SPECIFICATION Second Revision
Document Title [Hindi] : कांच और सिरेमिक उद्योग के लिए चूना पत्थर और डोलोमाइ - विशिष्टि ( दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 2
ICS Code : 81.040.30
Date of Project Approval : 29-07-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 997: 1973
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 997: 1973


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Raw material for ceramic industry
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Limestone and Dolomite for Ceramic and Glass Industry
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department of Industrial Policy and Promotion
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 In this third revision, the instrumental methods have been added and several editorial changes such as inclusion of ICS No., Hindi title and Reference clause have also been incorporated.
2 In this standard separate limits for iron content (as Fe2O3) have been prescribed for calcite, limestone and dolomite. Limits for lime (as CaO) have not been prescribed separately for dolomitic limestone and dolomite but have been left for agreement between the purchaser and the supplier subject to the total lime and magnesia content being inconformity with the requirements given in Table 1. A method for the determination of loss on ignition has also been prescribed in the standard to enable one to have an idea of the nature of the material.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-10-2022 17-02-2023 17-03-2023 17-07-2023 Mr. Mohit Garg 17-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-07-2022 -------
2 P-Draft Waived 17-10-2022 The ARP has already been circulated in the portal for 21 days. -------
3 WC Draft 17-10-2022 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 17-10-2022 WC approved by HOD
CHDC   -------