Document Details
Name of Department/Committee : MTD 13
Document Number : MTD 13 ( 20888)
Document Title [English] : Chrome Manganese — Specification ( Second Revision )
Document Title [Hindi] : क्रोममैंगनीज - विशिष्टि (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 77.100
Date of Project Approval : 22-06-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 3012: 2023
Standards to be Superseded :


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Ores and sponge iron, ferro alloys and other metallic additions
Sub Sub Group : Other Metallic additions
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : SPECIFICATION FOR CHROME MANGANESE
ITCHS Code :
Ministry :
  • Ministry of Consumer Affairs, Food and Public Distribution - Department of Consumer Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Division Council Chairperson Approval Details
Request Date: 03-03-2023
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Amit Bhattacharjee
Attachment :  View
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1387: 1993 General requirements for the supply of metallurgical materials (Second Revision)
2 IS 1472: 1977 Methods of sampling ferro-alloys for determination of chemical composition (First Revision)

Sl.No. Synosis Points
1 The standard had been drafted to homogenize its structure and wording with other physical test standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-10-2022 17-03-2023 01-06-2023 16-10-2023 Mr. RAM SAI KUMAR GEDELA 17-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-06-2022 -------
2 P-Draft 17-10-2022 Covering letter generated -------
3 P-Draft 17-10-2022 Duration : 21 Days MTD 13, MTD 13 : 1,  -------
4 Skipped to W-Draft 28-11-2022 Stage-Changed -------
5 WC Draft 28-11-2022 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 28-11-2022 WC approved by HOD
MTDC  MTD 13, MTD 13 : 1, -------
7 Skipped to Finalization 03-01-2023 Stage-Changed -------
8 Finalization 03-01-2023 ------ -------
9 Final Draft 03-01-2023 Submited for HOD approval
-------
10 Final Draft Rejected by HOD 04-01-2023 Final Draft rejected by HOD
Remarks: Please modify as per IS 12 and put up
-------
11 Final Draft 04-01-2023 Submited for HOD approval
-------
12 Final Draft draft accepted by HOD and sent to Publication 04-01-2023 Final Draft approved by HOD -------
13 Accepted by Publication 25-01-2023 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
14 Proof sent by OSA to Publication 25-01-2023 Proof to OSA Stage-Skipped -------
15 Proof sent to Technical Department 25-01-2023 Please send DOCUMENT in editable word format, and also enter the standard to be withdrawn in document details in the portal -------
16 Proof sent to Publication 25-01-2023 IS 3012: 1985 is to be withdrawn after publishing IS 3012: 2023 -------
17 Proof sent by OSA to Publication 16-02-2023 Proof to OSA Stage-Skipped -------
18 Proof sent to Technical Department 16-02-2023 proof attached, please check and revert back with DC corrections, if any. -------
19 Proof sent to Publication 21-02-2023 MTDC Approval will be attached in the next stage. -------
20 Skipped to Pdf Stage 02-03-2023 Proof to Technial Department Stage-Skipped -------
21 Stage-Skipped 02-03-2023 PDF to OSA Stage-Skipped -------
22 Pdf sent by Publication to Technical Department 02-03-2023 The title of the standard has been changed, kindly update the same on portal and revert back. -------
23 Pdf sent by Technical Department to Publication 03-03-2023 The title of the standard has been changed in the portal and accordingly, title has to be modified in page 3, just before the scope of standard. -------
24 Pdf sent by Publication to Technical Department 10-03-2023 Marked corrections has been done. -------
25 Pdf sent by Technical Department to Publication 22-03-2023 The document looks alright and can be printed. -------
26 Pdf sent by Publication to Technical Department 28-03-2023 see the attachment -------
27 Pdf sent by Technical Department to Publication 28-03-2023 Gazette details are modified in remarks as informed. the document can be sent for printing -------
28 Ready for Gazette 11-04-2023 Stage-Changed -------