Name of Department/Committee : MED 07
Document Number : MED 07 ( 20952)
Document Title [English] : BULK HANDLING EQUIPMENT BAG STACKER CUM LOADER PORTABLE DESIGN AND CONSTRUCTION GENERAL REQUIREMENTS First Revision of IS 14704
Document Title [Hindi] : बल्क प्रहस्तन उपस्कर — बैग स्टेकर—सह लोडर सुवाह्य — डिजाइन और निर्माण — सामान्य अपेक्षाएँ (आई एस 14704 का प्रथम पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 53.040.10
Date of Project Approval : 18-10-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14704: 1999
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14704: 1999


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Non-powered material handling equipment
Aspects : Product Specification
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 8597: 1977 Specification for flat belt conveyors

Sl.No. Synosis Points
1 This standard covers the general requirements of mechanical type portable bag stacker-cum-loader/unloader (PBSCLU). The requirements laid down in the Indian Standard are not withstanding the requirements of any other Statutes. Regulations, Acts and Rules of any Central or State Government Orders issued from time to time which are otherwise to be met. The PBSCLU are used without much difficulty for stacking in empty godowns and de-stacking fully loaded godowns starting from one end. PBSCLU are also easily used where large aisle ways are provided for straight line loading and unloading. PBSCLU will be transported by trucks for installation in the aisle ways for loading/unloading wagon/trucks. The PBSCLU can also load and unload the wagon by keeping them in between two tracks. The PBSCLU can load and unload individual wagons, trucks and stacks in the godowns. The PBSCLU will be kept in between the road-fed godowns where there is enough space available for easy manoeuver ability. In ad

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-10-2022 18-03-2023 02-06-2023 17-10-2023 KHASHBOO KUMARI 18-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 18-10-2022 -------
2 P-Draft Waived 18-10-2022 -------
3 WC Draft 18-10-2022 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 18-10-2022 WC approved by HOD
MEDC   -------
5 Skipped to Finalization 03-01-2025 Stage-Changed -------
6 Finalization 20-12-2024 The document was pending review and finalization with the panel The committee finalized the document during the TC meeting -------
7 Final Draft 06-01-2025 Submited for HOD approval

Remarks: HMED may consider and approve
-------
8 Final Draft draft accepted by HOD and sent to Publication 07-01-2025 Final Draft approved by HOD -------
9 Accepted by Publication 08-01-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
10 Proof sent to Technical Department 13-01-2025 प्रथम एडिटिड कॉपी संलग्न है । -------
11 Proof sent to Publication 17-01-2025 The reply of the comments has been updated, kindly proceed. -------