Document Details
Name of Department/Committee : CHD 10
Document Number : CHD 10 ( 20974)
Document Title [English] : PSYCHROMETERS UNVENTILATED DRY AND WET BULB HYGROMETERS - SPECIFICATION First Revision
Document Title [Hindi] : साइकोमीटर, बिना हवा के (सूखे और गीले बल्ब हाइग्रोमीटर) - विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 17.060
Date of Project Approval : 29-07-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 5725: 1970
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 5725: 1970


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Laboratory glassware and test methods
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Psychrometers, Hygrometer
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Psychrometers, which are also known as dry and wet bulb hygrometers and curometers, unventilated, are used for measuring atmospheric humidity (relative humidity) for agricultural, commercial and industrial purposes. They consist of two similar liquid-in-glass thermometers exposed side by side, the bulb of one of which is covered with a piece of wet fabric and allowed to cool by natural free evaporation. Relative humidity is computed from the readings of these two thermometers by the use of psychrometric tables.
2 This standard was originally published in 1970. The first revision of this standard is undertaken in view of the technological advancements taking place in the industry. Several editorial changes such as the inclusion of ICS No., Hindi Title, Reference Clause, and statuary changes such as the BIS Certification Marking clause as per the BIS Act 2016 have also been incorporated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-10-2022 18-02-2023 18-03-2023 18-07-2023 Mr. Mohit Garg 18-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-07-2022 -------
2 P-Draft Waived 18-10-2022 The document has already been circulated through portal as an ARP Process. -------
3 WC Draft 18-10-2022 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 26-10-2022 WC approved by HOD
CHDC   -------