Document Details |
|||||
Name of Department/Committee : | CHD 10 | ||||
---|---|---|---|---|---|
Document Number : | CHD 10 ( 20996) | ||||
Document Title [English] : | BRIX HYDROMETERS SPECIFICATION Second Revision | ||||
Document Title [Hindi] : | ब्रिक्स हाइड्रोमीटर – विशिष्टि (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 17.060 | ||||
Date of Project Approval : | 29-07-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemical Products |
Sub Sub Group : | Laboratory glassware and test methods |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Brix Hydrometer |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The second revision of this standard is undertaken in view of the technological advancements taking place in the industry. Several editorial changes such as the inclusion of ICS No., Hindi Title, Reference Clause, and statuary changes such as the BIS Certification Marking clause as per the BIS Act 2016 have also been incorporated. | |
2 | Brix hydrometers and thermo-hydrometers prescribed in this standard are based on the L50 series of density hydrometers [ see IS 3104 ( Part 1 ): 1982 and IS 3104 ( Part 2 ): 1982 ]. | |
3 | In the formulation of this standard due weightage has been given to the available data relating to tables for conversion of degree Brix to relative density (20°/4°C) and corrections on account of thermal expansions of glass, liquid solutions, etc. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 29-07-2022 | ------- | ||
2 | P-Draft Waived | 18-10-2022 | The revised draft has already been circulated through the portal as a part of the ARP Process. | ------- | |
3 | WC Draft | 18-10-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 26-10-2022 | WC approved by HOD |
CHDC | ------- |