Document Details
Name of Department/Committee : CHD 10
Document Number : CHD 10 ( 20996)
Document Title [English] : BRIX HYDROMETERS SPECIFICATION Second Revision
Document Title [Hindi] : ब्रिक्स हाइड्रोमीटर – विशिष्टि (दूसरा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 17.060
Date of Project Approval : 29-07-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7324: 1983
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 7324: 1983


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Chemical Products
Sub Sub Group : Laboratory glassware and test methods
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Brix Hydrometer
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The second revision of this standard is undertaken in view of the technological advancements taking place in the industry. Several editorial changes such as the inclusion of ICS No., Hindi Title, Reference Clause, and statuary changes such as the BIS Certification Marking clause as per the BIS Act 2016 have also been incorporated.
2 Brix hydrometers and thermo-hydrometers prescribed in this standard are based on the L50 series of density hydrometers [ see IS 3104 ( Part 1 ): 1982 and IS 3104 ( Part 2 ): 1982 ].
3 In the formulation of this standard due weightage has been given to the available data relating to tables for conversion of degree Brix to relative density (20°/4°C) and corrections on account of thermal expansions of glass, liquid solutions, etc.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-10-2022 18-02-2023 18-03-2023 18-07-2023 Mr. Mohit Garg 18-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-07-2022 -------
2 P-Draft Waived 18-10-2022 The revised draft has already been circulated through the portal as a part of the ARP Process. -------
3 WC Draft 18-10-2022 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 26-10-2022 WC approved by HOD
CHDC   -------