Document Details
Name of Department/Committee : WRD 01
Document Number : WRD 01 ( 20347)
Document Title [English] : Measurement of Fluid Flow in Closed Conduits Velocity Area Method Using Pitot Static Tube
Document Title [Hindi] : बंद नाली में द्रव प्रवाह का मापन — पिटोट स्टेटिक ट्यूब का उपयोग करते हुए वेग क्षेत्र विधि
Document Type : Revision
Language : Bilingual
Priority : 1
ICS Code : 17.120.10
Date of Project Approval : 28-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14973: 2019
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14973: 2019


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydrometry and equipments
Sub Sub Group : Hydrometry & Equipments
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : Pitot Static Tube
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : Identical
Organization Type: ISO

Sl.No. Synosis Points
1 All the mathematical formulae have been numbered
2 The essential Formula 4 has been corrected from Δρ/p to Δp/p;
3 The related Table 2 is corrected likewise;
4 The last sentence in 8.2 “for selected values of g and the Δρ/p…..” was corrected accordingly;
5 In 11.2.2 in the 2nd paragraph ef is corrected by e or f.
6 Figure A.5 was changed editorially, the millimetre-grid has been removed

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 23-08-2022 23-11-2022 23-12-2022 23-02-2023 Mr. Ajay Meena 23-08-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-04-2022 -------
2 P-Draft Waived 23-08-2022 -------
3 WC Draft 23-08-2022 Duration : 62 Days
Submitted for HOD approval
-------
4 WC Draft 23-08-2022 WC approved by HOD
WRDC  WRD 01, -------