Document Details |
|||||
Name of Department/Committee : | WRD 01 | ||||
---|---|---|---|---|---|
Document Number : | WRD 01 ( 20347) | ||||
Document Title [English] : | Measurement of Fluid Flow in Closed Conduits Velocity Area Method Using Pitot Static Tube | ||||
Document Title [Hindi] : | बंद नाली में दà¥à¤°à¤µ पà¥à¤°à¤µà¤¾à¤¹ का मापन — पिटोट सà¥à¤Ÿà¥‡à¤Ÿà¤¿à¤• टà¥à¤¯à¥‚ब का उपयोग करते हà¥à¤ वेग कà¥à¤·à¥‡à¤¤à¥à¤° विधि | ||||
Document Type : | Revision | ||||
Language : | Bilingual | ||||
Priority : | 1 | ||||
ICS Code : | 17.120.10 | ||||
Date of Project Approval : | 28-04-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydrometry and equipments |
Sub Sub Group : | Hydrometry & Equipments |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | Pitot Static Tube |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | Identical |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | All the mathematical formulae have been numbered | |
2 | The essential Formula 4 has been corrected from Δρ/p to Δp/p; | |
3 | The related Table 2 is corrected likewise; | |
4 | The last sentence in 8.2 “for selected values of g and the Δρ/p…..” was corrected accordingly; | |
5 | In 11.2.2 in the 2nd paragraph ef is corrected by e or f. | |
6 | Figure A.5 was changed editorially, the millimetre-grid has been removed |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-04-2022 | ------- | ||
2 | P-Draft Waived | 23-08-2022 | ------- | ||
3 | WC Draft | 23-08-2022 | Duration : 62 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-08-2022 | WC approved by HOD |
WRDC WRD 01, | ------- |