Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 21409)
Document Title [English] : Design and construction of combined piled raft foundations - Code of practice
Document Title [Hindi] : संयुक्त पाइल-राफ्ट नींवों का डिज़ाइन और निर्माण - रीति संहिता
Document Type : New
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 27-04-2022
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title : Combined pile-raft foundation
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
  • Ministry of Road Transport and Highways
  • Ministry of Railways
  • Ministry of Power
  • Department of Atomic Energy
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This document covers provisions for design and construction of combined piled raft foundations (CPRF) for residential and industrial structures, store houses, storage tanks, etc. . This composite foundation which combines load carrying capabilities of raft and pile foundations together may be implemented in any of the following situations: a) Where a raft cannot provide an adequate bearing capacity due to excessive settlement beyond permissible limit; and b) Where the raft is unable to perform under the serviceability requirement (for example, if settlement exceeds permissible limit for raft) of the structure. In both cases, piles can be introduced below the raft to improve the safety against failure or to reduce the settlement to an acceptable level.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 09-12-2022 09-05-2023 24-07-2023 09-12-2023 MADHURIMA MADHAV 09-12-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-04-2022 -------
2 P-Draft Waived 14-12-2022 The draft was circulated among the members of the committee as working draft. It was decided to issue the draft modified by the concerned technical committee in wide circulation. -------
3 WC Draft 14-12-2022 Duration : 32 Days
Submitted for HOD approval
-------
4 WC Draft 14-12-2022 WC approved by HOD
CEDC   -------