Document Details
Name of Department/Committee : TED 14
Document Number : TED 14 ( 21429)
Document Title [English] : AIRCRAFT INNER TUBE AND TUBELESS TYRE VALVES — CORES AND CAPS — TEST METHODS
Document Title [Hindi] : विमान के भीतरी ट्यूब और ट्यूबलेस टायर वाल्व — कोर और कैप्स — परीक्षण विधियाँ
Document Type : Revision
Language : English
Priority : 3
ICS Code : 83.160.20
Date of Project Approval : 13-12-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11903: 1986
Standards to be Superseded :


Classification Details
Group : Transport and Related Products
Sub Group : Aircraft equipments and air cargo handing
Sub Sub Group : Aircraft accessories & Fittings
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Civil Aviation
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 9475:1994
Organization Type: ISO

Sl.No. Synosis Points
1 This International Standard specifies the test methods used for valve cores and caps for aircraft tyres, with or without inner tubes, and minimum airtightness standards. It constitutes a detailed method allowing products to be evaluated on the same basis, and results to be compared.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 13-12-2022 13-05-2023 28-07-2023 13-12-2023 SHRI SHIVAM AGGARWAL 13-12-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-12-2022 -------
2 P-Draft 13-12-2022 Covering letter generated -------
3 P-Draft 13-12-2022 Duration : 30 Days TED 14, -------
4 Skipped to W-Draft 13-06-2023 Stage-Changed -------
5 WC Draft 13-06-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Document is being Wide Circulated for 60 days for Comments
-------
6 WC Draft 19-06-2023 WC rejected by HOD
Remarks: Please make the corrections
-------
7 WC Draft 02-08-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Document is being Wide Circulated for 60 days for Comments
-------
8 WC Draft 02-08-2023 WC rejected by HOD
Remarks: Please make the correction in the last para of the Foreword
-------
9 WC Draft 04-08-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The Document is being Wide Circulated for 60 days for Comments
-------
10 WC Draft 04-08-2023 WC approved by HOD
TEDC  TED 14, -------