Document Details |
|||||
Name of Department/Committee : | MED 07 | ||||
---|---|---|---|---|---|
Document Number : | MED 07 ( 21445) | ||||
Document Title [English] : | WAGON PULLER/PUSHER - GENERAL REQUIREMENTS (First Revision) | ||||
Document Title [Hindi] : | वैगन पुलर/पुशर की - सामान्य अपेक्षाएं ( पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 45.060.20 | ||||
Date of Project Approval : | 07-12-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Batching & Bagging Equipment ,Conveying, Stacking, loading and un loading equipment |
Aspects : | Product Specification |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 10464: 1983 | Data sheet for selection of wagon puller/pusher |
Sl.No. | Synosis Points | |
1 | a) This Indian standard covers general and safety requirements, field of application, types and limiting dimensions of the wagon pullers/pushers for hauling/spotting broad gauge top open railway wagons. b) This standard is not applicable to hopper type wagons. c) Wagons suitable only for mechanical handling shall be handled by the wagon pullers/pusher covered by this standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 07-12-2022 | ------- | ||
2 | P-Draft Waived | 13-12-2022 | ------- | ||
3 | WC Draft | 13-12-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 13-12-2022 | WC approved by HOD |
MEDC MED 07, | ------- |
5 | Skipped to Finalization | 30-12-2024 | Stage-Changed | ------- | |
6 | Finalization | 20-12-2024 | ------ | ------- | |
7 | Final Draft | 30-12-2024 | Submited for HOD approval |
------- | |
8 | Final Draft draft accepted by HOD and sent to Publication | 31-12-2024 | Final Draft approved by HOD | ------- | |
9 | Accepted by Publication | 06-01-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
10 | Proof sent to Technical Department | 09-01-2025 | प्रथम एडिटिड कॉपी संलग्न है । | ------- | |
11 | Proof sent to Publication | 10-01-2025 | Kindly proceed. | ------- | |
12 | Skipped to Pdf Stage | 14-01-2025 | Proof to Technial Department Stage-Skipped | ------- | |
13 | Pdf sent by Publication to Technical Department | 14-01-2025 | डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । Kindly update Hindi and English title as per the document attached. | ------- |