Document Details
Name of Department/Committee : MED 07
Document Number : MED 07 ( 21447)
Document Title [English] : BULK HANDLING EQUIPMENT CRAWLER TRACTORS DATA SHEET PART 1 INFORMATION TO BE SUPPLIED BY PURCHASER Second Revision
Document Title [Hindi] : राशि प्रहस्तन उपस्कर - सर्पी ट्रैक्टर - आंकड़ा पत्र भाग 1 - क्रेता द्वारा दी जाने वाली जानकारी
Document Type : Revision
Language : English
Priority : 3
ICS Code : 53.040.30
Date of Project Approval : 07-12-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11738 : Part 1: 1993
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11738 : Part 1: 1993


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Batching & Bagging Equipment ,Conveying, Stacking, loading and un loading equipment
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 10463 : Part 6: 1983 Glossary of terms for bulk handling equipment: Part 6 cyclic loose bulk handling equipment (Non - Stationary)
2 IS 12645: 1993 Earth - Moving machinery - Crawler and wheel tractor dozer blades - Volumetric ratings (First Revision)

Sl.No. Synosis Points
1 This standard lays down the information to be provided by the purchaser at the time of enquiry or order. He may also provide the additional information such as sieve analysis, etc, suitably which may help the manufacturer in selecting the best suited equipment for the duty required to be performed by the equipment.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 13-12-2022 13-05-2023 28-07-2023 13-12-2023 KHASHBOO KUMARI 13-12-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-12-2022 -------
2 P-Draft Waived 13-12-2022 -------
3 WC Draft 13-12-2022 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 03-01-2023 WC approved by HOD
MEDC   -------
5 Skipped to Finalization 30-12-2024 Stage-Changed -------
6 Finalization 20-12-2024 ------ -------
7 Final Draft 30-12-2024 Submited for HOD approval

Remarks: HMED may consider and approve
-------
8 Final Draft draft accepted by HOD and sent to Publication 31-12-2024 Final Draft approved by HOD -------
9 Final Draft 06-01-2025 Final Draft rejected by Publication
Remarks: Hindi title mismatch in document details mentioned on portal and that in F draft and English title with em dash should be the same on the portal and document.
-------
10 Final Draft 09-01-2025 Submited for HOD approval

Remarks: The corrections have been made in the document as per the suggestion of the publication department HMED may kindly consider and approve
-------
11 Final Draft draft accepted by HOD and sent to Publication 09-01-2025 Final Draft approved by HOD -------
12 Accepted by Publication 10-01-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
13 Accepted by Publication 10-01-2025 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
14 Proof sent to Technical Department 17-01-2025 First copy attached, kindly check and revert the document for PDF stage. -------
15 Proof sent to Publication 21-01-2025 The document has been checked, kindly proceed to pdf stage. -------