Document Details
Name of Department/Committee : MHD 04
Document Number : MHD 04 ( 21659)
Document Title [English] : PTFE Piston Cutting Jig — Specification (First Revision)
Document Title [Hindi] : पीटीएफई पिस्टन कटिंग जिग — विशिष्टि (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 11.040.30
Date of Project Approval : 29-12-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9718: 1981
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 9718: 1981


Classification Details
Group : Medical and Hospital Equipments
Sub Group : Surgical instruments and accessories
Sub Sub Group : Instruments/Equipment used in ENT surgery
Aspects : Product Specification
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Health and Family Welfare
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1501 : Part 1: 2020 Metallic Materials Vickers Hardness Test Part 1 Test Method ( Fifth Revision )
2 IS 6603: 2024 Stainless Steel Semi-Finished Products, Bars, Wire Rods and Bright Bars — Specification (Second Revision)
3 IS 12937: 1990 Engineering metrology - Methods of testing straightness, flatness and perpendicularity

Sl.No. Synosis Points
1 Requirement for PTFE (Teflon) piston cutting Jig used by ENT surgeons while cutting PTFE pistons of suitable size.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 29-12-2022 30-11-2023 31-01-2024 30-03-2024 Ms. GURPREET KAUR BHOMBRA 21-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-12-2022 -------
2 P-Draft Waived 29-12-2022 The Panel has provided inputs for revision of standard -------
3 WC Draft 29-12-2022 Duration : 90 Days
Submitted for HOD approval
-------
4 WC Draft 31-01-2023 WC approved by HOD
MHDC   -------
5 WC Draft 21-09-2023 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 21-09-2023 WC approved by HOD
MHDC   -------
7 Skipped to Finalization 26-06-2024 Stage-Changed -------
8 Finalization 26-06-2024 ------ -------
9 Final Draft 11-07-2024 Submited for HOD approval
-------
10 Final Draft draft accepted by HOD and sent to Publication 11-07-2024 Final Draft approved by HOD -------
11 Accepted by Publication 25-07-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
12 Proof sent by OSA to Publication 25-07-2024 Proof to OSA Stage-Skipped -------
13 Proof sent to Technical Department 25-07-2024 प्रथम एडिटिड कॉपी संलग्न है । -------
14 Proof sent to Publication 29-07-2024 ------ -------
15 Proof sent by OSA to Publication 30-07-2024 Proof to OSA Stage-Skipped -------
16 Skipped to Pdf Stage 30-07-2024 Proof to Technial Department Stage-Skipped -------
17 Stage-Skipped 30-07-2024 PDF to OSA Stage-Skipped -------
18 Pdf sent by Publication to Technical Department 30-07-2024 डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । -------
19 Pdf sent by Technical Department to Publication 22-08-2024 Kindly make changes according to the comments provided, thank you. -------
20 Pdf sent by Publication to Technical Department 29-08-2024 Correction done as marked in the document, kindly check and revert along with DC approval. -------
21 Pdf sent by Technical Department to Publication 06-09-2024 Pls refer to proof document sent to Technical department, where the Figure 1 is correct but the same figure was seen cropped in pdf sent to TD stage. Correct Fig.1 is attached, kindly make necessary changes. -------
22 Pdf sent by Publication to Technical Department 09-09-2024 Correction done as marked in the document, kindly check and revert along with DC approval. -------