Document Details |
|
Name of Department/Committee : | FAD 20 |
---|---|
Document Number : | FAD 20 ( 21688) |
Document Title [English] : | Root and tuber vegetable washer — Continuous type — Specification and Test code |
Document Title [Hindi] : | जड़ और कंद प्रकार की सब्जी के लिए धुलाई उपकरण — सतत प्रकार — विशिष्टिऔर परीक्षण कोड |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | 65.060 |
Date of Project Approval : | 16-06-2022 |
Standards to be Superseded : |
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Agricultural Implements and godowns |
Sub Sub Group : | Other Agro Processing Equipments |
Aspects : | Methods of tests |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Carrot Washer |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard specifies the material, constructional, performance, and other requirements of continuous type root and tuber vegetable washer. It also prescribes the test method for evaluating the performance of this equipment. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-06-2022 | ------- | ||
2 | P-Draft | 03-01-2023 | Covering letter generated | ------- | |
3 | P-Draft | 03-01-2023 | Duration : 21 Days Remarks : In the 19th committee meeting committee requested Dr Ravindra Naik to reconsider the draft for changing scope title of the draft standard and to provide the corrected draft which upon receiving will be sent as p-draft Preliminary draft to committee members for 21 days |
FAD 20, FAD 20, | ------- |
4 | P-Draft | 03-01-2023 | Covering letter generated | ------- | |
5 | P-Draft | 03-01-2023 | Duration : 21 Days Remarks : In the 19th committee meeting committee requested Dr Ravindra Naik to reconsider the draft for changing scope title of the draft standard and to provide the corrected draft which upon receiving will be sent as p-draft Preliminary draft to committee members for 21 days |
FAD 20, FAD 20, | ------- |
6 | Skipped to W-Draft | 02-04-2024 | Stage-Changed | ------- | |
7 | WC Draft | 02-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : In its 22nd meeting of FAD 20 the committee decided to send this draft into WC for a period of 60 days to seek comments |
------- | |
8 | WC Draft | 03-04-2024 | WC rejected by HOD Remarks: The titke of the draft and the Foreword is missing. |
------- | |
9 | WC Draft | 03-04-2024 | Duration : 60 Days Submitted for HOD approval Remarks : Now it is corrected madam |
------- | |
10 | WC Draft | 03-04-2024 | WC approved by HOD |
FADC FAD 20, | ------- |
11 | WC-Draft | 04-04-2024 | WC-Draft Email Notifications Sent | FADC, FAD 20, | ------- |