Document Details
Name of Department/Committee : MTD 13
Document Number : MTD 13 ( 21007)
Document Title [English] : Vanadium Pentoxide — Specification (Second Revision)
Document Title [Hindi] : वैनेडियम पेंटोक्साइि — विशिष्टि ( दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 77.100
Date of Project Approval : 20-06-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 5633: 2023
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 5633: 2023


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Ores and sponge iron, ferro alloys and other metallic additions
Sub Sub Group : Other Metallic additions
Aspects : Product Specification
Risk : None
Certification : None
Short Commom Man's Title : Vanadium Pentoxide
ITCHS Code :
Ministry :
  • Ministry of Steel
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Division Council Chairperson Approval Details
Request Date: 22-03-2023
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Amit Bhattacharjee
Attachment :  View
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1387: 1993 General requirements for the supply of metallurgical materials (Second Revision)
2 IS 1472: 1977 Methods of sampling ferro-alloys for determination of chemical composition (First Revision)

Sl.No. Synosis Points
1 a) Reference clause and manufacturing clause have been included; b) Addition of EH&S Hazardous Waste label and their pictorial representation in clause 9.2; and c) During the current revision, the standard had been drafted to homogenize its structure and wording with other product standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-10-2022 18-03-2023 02-06-2023 17-10-2023 Mr. RAM SAI KUMAR GEDELA 18-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 20-06-2022 -------
2 P-Draft 19-10-2022 Covering letter generated -------
3 P-Draft 19-10-2022 Duration : 21 Days MTD 13, MTD 13 : 1,  -------
4 Skipped to W-Draft 01-12-2022 Stage-Changed -------
5 WC Draft 01-12-2022 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 01-12-2022 WC approved by HOD
MTDC  MTD 13 : 1, MTD 13, -------
7 Skipped to Finalization 03-01-2023 Stage-Changed -------
8 Finalization 01-01-2023 ------ -------
9 Final Draft 03-01-2023 Submited for HOD approval
-------
10 Final Draft Rejected by HOD 03-01-2023 Final Draft rejected by HOD
Remarks: Please make the changes as discussed
-------
11 Final Draft 03-01-2023 Submited for HOD approval
-------
12 Final Draft Rejected by HOD 04-01-2023 Final Draft rejected by HOD
Remarks: Please make the changes as discussed
-------
13 Final Draft 04-01-2023 Submited for HOD approval
-------
14 Final Draft draft accepted by HOD and sent to Publication 04-01-2023 Final Draft approved by HOD -------
15 Accepted by Publication 25-01-2023 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
16 Accepted by Publication 25-01-2023 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
17 Accepted by Publication 25-01-2023 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
18 Proof sent by OSA to Publication 25-01-2023 Proof to OSA Stage-Skipped -------
19 Proof sent to Technical Department 25-01-2023 Please send DOCUMENT in editable word format, and also enter the standard to be withdrawn in document details in the portal -------
20 Proof sent to Publication 25-01-2023 IS 5633: 1973 is to be withdrawn after publishing IS 5633: 2023 -------
21 Proof sent to Technical Department 02-03-2023 Query resolve. -------
22 Proof sent to Publication 03-03-2023 Changes were incorporated in the standard. -------
23 Skipped to Pdf Stage 13-03-2023 Proof to Technial Department Stage-Skipped -------
24 Stage-Skipped 13-03-2023 PDF to OSA Stage-Skipped -------
25 Pdf sent by Publication to Technical Department 13-03-2023 Kindly check the attached PDF document and revert along with DC Chairperson approval and Gazette details. -------
26 Pdf sent by Technical Department to Publication 22-03-2023 The document looks alright and can be sent for printing -------
27 Pdf sent by Publication to Technical Department 28-03-2023 Marked corrections has been done. -------
28 Pdf sent by Technical Department to Publication 06-04-2023 The document looks alright and can be sent for printing -------
29 Pdf sent by Publication to Technical Department 12-04-2023 Title not match in pdf with portal (see the attachment) -------
30 Pdf sent by Technical Department to Publication 24-04-2023 The title is drafted in line with other Indian standards and there is no change in meaning of the Title of standard. -------
31 Pdf sent by Publication to Technical Department 25-04-2023 ICS NO MISMATCH in pdf and module please clear the correct ICS NO -------
32 Pdf sent by Technical Department to Publication 27-04-2023 Modified as suggested. -------
33 Pdf sent by Publication to Technical Department 04-05-2023 correct the title in module otherwise problem in uploading sir your are right (The title is drafted in line with other Indian standards and there is no change in meaning of the Title of standard.) but after problem in uploading so correct the title -------
34 Pdf sent by Technical Department to Publication 17-05-2023 Modified as suggested. -------
35 Pdf sent by Publication to Technical Department 15-06-2023 see the attachment. -------
36 Pdf sent by Technical Department to Publication 20-06-2023 Please modify the title in standard as per the title modified in portal. -------
37 Ready for Gazette 26-06-2023 Stage-Changed -------