Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 21048)
Document Title [English] : Mould Assembly for Determination of Permeability of Soils Specification
Document Title [Hindi] : मृदा की पारगम्यता के निर्धारण के लिए सांचा असेंबली - विशिष्टि
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020; 13.080.20
Date of Project Approval : 27-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11209: 1985
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11209: 1985


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Soil Testing Equipments
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Mould assembly for permeability determination
ITCHS Code :
Ministry :
  • Ministry of Railways
  • Ministry of Power
  • Ministry of Road Transport and Highways
  • Ministry of Housing and Urban Affairs
  • Ministry of Micro, Small and Medium Enterprises
  • Ministry of Petroleum and Natural Gas
  • Ministry of Commerce and Industry
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard covers the details of mould, drainage base, drainage cap, extension collar, metal ring and rod used as the mould assembly for laboratory determination of the coefficient of permeability of soils.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 19-10-2022 19-03-2023 03-06-2023 18-10-2023 MADHURIMA MADHAV 19-10-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-04-2022 -------
2 P-Draft Waived 20-10-2022 It is being pre 2000 standard, it has been decided in consultation with Chairman, CED 43 to issue the draft revision directly in wide circulation waiving P draft. -------
3 WC Draft 20-10-2022 Duration : 31 Days
Submitted for HOD approval
-------
4 WC Draft 20-10-2022 WC approved by HOD
CEDC  CED 43, CED 48, -------