Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 21138)
Document Title [English] : Mild Steel Thin Walled Samplnig Tubes and Sampler Heads Specification
Document Title [Hindi] : मृदु इस्तपात की पतली दीवार वाली नमूना नलियां और नमूना सिरे - विशिष्टि
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020; 13.080.20
Date of Project Approval : 27-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11594: 1985
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11594: 1985


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Soil Testing Equipments
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Thin walled sampling tubes and sampler heads
ITCHS Code :
Ministry :
  • Ministry of Petroleum and Natural Gas
  • Ministry of Power
  • Ministry of Railways
  • Ministry of Road Transport and Highways
  • Ministry of Commerce and Industry
  • Ministry of Micro, Small and Medium Enterprises
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard covers requirements for thin walled sampling tubes and sampler heads for in-situ sampling of soils, as required for open drive tube samplers.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-11-2022 01-04-2023 16-06-2023 31-10-2023 MADHURIMA MADHAV 01-11-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-04-2022 -------
2 P-Draft Waived 09-11-2022 This is being pre 2000 standard, it has been decided in consultation with Chairman, CED 43 to issue the draft revision directly in wide circulation waiving P draft. -------
3 WC Draft 09-11-2022 Duration : 31 Days
Submitted for HOD approval
-------
4 WC Draft 09-11-2022 WC approved by HOD
CEDC  CED 43, CED 48, -------