Document Details
Name of Department/Committee : TED 07
Document Number : TED 07 ( 21145)
IS Number (Technical Department) : IS 15636: 2022
Document Title [English] : AUTOMOTIVE VEHICLES —PNEUMATIC TYRES FOR COMMERCIAL VEHICLES— DIAGONAL AND RADIAL PLY— SPECIFICATION (Second Revision) - Amendment no. 1
Document Title [Hindi] : स्वचल वाहन — व्यावसायिक वाहनों के लिए वातिल टायर — आड़ी और रेडियल प्लाई — विशिष्टि ( दूसरा पुनरीक्षण ) - संशोधन संख्या 1
Document Type : Amendment
Amendment No : 1
Language : English
Priority : 3
ICS Code :
Date of Project Approval : 24-06-2022
Standards to be Superseded :

Sl.No. Synosis Points
1 This standard specifies the general, dimensional, and performance requirements of new pneumatic tyres designed primarily, but not only, for vehicles in categories M2, M3, N, T3 and T4 as defined in IS 14272 : 2011 ‘Automotive vehicles — Types terminology (first revision)’. However, it does not apply to tyre types identified by speed symbols corresponding to speeds below 80 km/h.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-11-2022 02-02-2023 02-03-2023 02-05-2023 Mr. AUGUST DUBEY 02-11-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-06-2022 -------
2 P-Draft Waived 02-11-2022 In 35th meeting, committee decided to put the amendment document in WC directly -------
3 WC Draft 02-11-2022 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 16-11-2022 WC approved by HOD
TEDC   -------
5 WC Draft 06-07-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : In 37th meeting of TED 7 committee recommended to put the revised draft document in WC for 60 days
-------
6 WC Draft 16-07-2023 WC approved by HOD
TEDC   -------
7 WC Draft 26-12-2023 Stage-Changed -------
8 Finalization 01-12-2023 ------ -------
9 Final Draft 26-12-2023 Submited for HOD approval

Remarks: Committee deliberated and decided to process the document into Publication It authorized BIS to carry out editorial correction if any
-------
10 Final Draft Rejected by HOD 27-12-2023 Final Draft rejected by HOD
Remarks: Please make the necessary corrections as discussed
-------
11 Final Draft 27-12-2023 Submited for HOD approval
-------
12 Final Draft Rejected by HOD 27-12-2023 Final Draft rejected by HOD
Remarks: Please make the necessary corrections as discussed
-------
13 Final Draft 27-12-2023 Submited for HOD approval
-------
14 Final Draft draft accepted by HOD and sent to Publication 27-12-2023 Final Draft approved by HOD -------
15 Accepted by Publication 01-01-2024 Final Draft accepted by Publication
Remarks: Accepted by Publication
-------
16 Proof sent by OSA to Publication 01-01-2024 Proof to OSA Stage-Skipped -------
17 Skipped to Pdf Stage 01-01-2024 Proof to Technial Department Stage-Skipped -------
18 Stage-Skipped 01-01-2024 PDF to OSA Stage-Skipped -------
19 Pdf sent by Publication to Technical Department 01-01-2024 प्रथम एडिटिड कॉपी संलग्न है । -------
20 Pdf sent by Technical Department to Publication 24-01-2024 Kindly provide PDF version for DC Approval -------
21 Stage-Skipped 02-02-2024 PDF to OSA Stage-Skipped -------
22 Pdf sent by Publication to Technical Department 02-02-2024 डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । -------
23 P-Draft Waived 12-04-2024 As per request received from Publication Department through email dated 10/04/2024, the document stage has been rolled back -------