Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 21226)
Document Title [English] : Apparatus for Determination of Dry Density of Soil by Core Cutter Method Specification
Document Title [Hindi] : कोर कटर विधि द्वारा मृदा के शुष्क घनत्व के निर्धारण के लिए उपकरण – विशिष्टि
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020; 13.080.20
Date of Project Approval : 27-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13468: 1992
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13468: 1992


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Soil Testing Equipments
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Apparatus for Determination of Dry Density of Soil by Core Cutter Method
ITCHS Code :
Ministry :
  • Ministry of Petroleum and Natural Gas
  • Ministry of Power
  • Ministry of Railways
  • Ministry of Road Transport and Highways
  • Ministry of Commerce and Industry
  • Ministry of Micro, Small and Medium Enterprises
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard covers the details of the cylindrical core cutter, steel dolly and steel rammer used for the determination of in-place dry density of fine grained natural or compacted soils free from aggregates, using a core cutter.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-11-2022 17-04-2023 02-07-2023 17-11-2023 MADHURIMA MADHAV 17-11-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-04-2022 -------
2 P-Draft Waived 17-11-2022 This is being pre 2000 standard, it has been decided in consultation with Chairman, CED 43 to issue the draft revision directly in wide circulation waiving P draft. -------
3 WC Draft 17-11-2022 Duration : 31 Days
Submitted for HOD approval
-------
4 WC Draft 17-11-2022 WC approved by HOD
CEDC  CED 43, CED 48, -------