Document Details
Name of Department/Committee : CED 43
Document Number : CED 43 ( 21232)
Document Title [English] : Shear Box Large for Testing of Soils - Specification
Document Title [Hindi] : मृदा परीक्षण के लिए अपरूपण बॉक्स (बड़ा) - विशिष्टि
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020; 13.080.20
Date of Project Approval : 27-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11593: 1986
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11593: 1986


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Soil Testing Equipments
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Shear Box (Large)
ITCHS Code :
Ministry :
  • Ministry of Petroleum and Natural Gas
  • Ministry of Power
  • Ministry of Railways
  • Ministry of Road Transport and Highways
  • Ministry of Commerce and Industry
  • Ministry of Micro, Small and Medium Enterprises
  • Ministry of Housing and Urban Affairs
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The equipment covered in this standard is used as a part of the assembly for the equipments used for laboratory determination of direct shear strength of the soil material with particle size up to 25 mm, that is, soils containing moorums, sands, gravels and other aggregates.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 18-11-2022 18-04-2023 03-07-2023 18-11-2023 MADHURIMA MADHAV 18-11-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 27-04-2022 -------
2 P-Draft Waived 01-12-2022 This is being pre 2000 standard, it has been decided in consultation with Chairman, CED 43 to issue the draft revision directly in wide circulation waiving P draft. -------
3 WC Draft 01-12-2022 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 01-12-2022 WC approved by HOD
CEDC   -------