Document Details
Name of Department/Committee : ETD 09
Document Number : ETD 09 ( 22546)
Document Title [English] : Cross-Linked Polyethylene Insulated Thermoplastic Sheathed Cables Specification Part 3 for working voltages above 33 kV up to and including 400 kV
Document Title [Hindi] : अनुप्रस्थ जुड़े हुए पौलीइथाईलीन विद्युतरोधी ताप स्थायी ढके केबल विशिष्टि भाग 3 — 66 किलोवोल्ट से 220 किलोवोल्ट तक की कार्यकारी वोल्टता के लिए (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 1
ICS Code : 29.060.20
Date of Project Approval : 11-10-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7098 : Part 3: 1993
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Cables, Conductors, Wires and Accessories
Sub Sub Group : Power cables
Aspects : Product Specification
Risk : High
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This draft standard (Part 3) covers the requirements of single-core and three core cross-linked polyethylene insulated, screened and thermoplastic outer sheathed cables for 3 phase AC Earthed System for electric supply for the voltage grades (33 KV to 400KV).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 26-05-2023 26-08-2023 26-09-2023 26-11-2023 MOHAMMAD ISRAFIL 26-05-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 11-10-2022 -------
2 P-Draft 26-05-2023 Covering letter generated -------
3 P-Draft 26-05-2023 Duration : 30 Days ETD 9, -------
4 Skipped to W-Draft 11-10-2023 Stage-Changed -------
5 WC Draft 11-10-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 15-10-2023 WC approved by HOD
ETDC   -------