Document Title [English] : PROFORMA FOR REPORTING PROGRESS DURING CONSTRUCTION FOR RIVER VALLEY PROJECTS PART 3 FLOOD CONTROL First Revision of IS 13218 Part 3
Document Title [Hindi] : नदी घाटी परियोजना के निर्माण के दौरान हुई प्रगति की रिपोर्ट देने के लिए प्रपत्र भाग 3 बाढ़ नियंत्रण (IS 13218 भाग 3 का पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.160
Date of Project Approval : 29-05-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13218 : Part 3: 1992
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13218 : Part 3: 1992


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Water Resources Planning Mangement and Evaluation of river valley and irrigation projects
Aspects : Others
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti (Water)
Sustainable development Goals :
  • DECENT WORK AND ECONOMIC GROWTH
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The object of monitoring is to identify bottlenecks and to ensure expeditious completion of schemes. Monitoring shall cover various stages of the project right from the conception stage to data collection, investigations planning, sanction, implementation, and operation. The performance would ensure the identification of bottlenecks and monitoring of progress, relating to any preset programme. This revision has been brought out in view of the various technological changes that have taken place in this field since 1992 and also to incorporate the latest practices prevalent in this field.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 01-11-2023 31-05-2024 30-09-2024 30-04-2025 Mr. Navdeep Yadav 07-11-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-05-2023 -------
2 P-Draft 29-05-2023 Covering letter generated -------
3 P-Draft 29-05-2023 Duration : 15 Days WRD 6, -------
4 Skipped to W-Draft 20-10-2023 Stage-Changed -------
5 WC Draft 20-10-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 31-10-2023 WC approved by HOD
WRDC   -------