Document Details
Name of Department/Committee : ETD 18
Document Number : ETD 18 ( 22821)
Document Title [English] : Methods of test for direct arc furnaces (First Revision )
Document Title [Hindi] : प्रत्यक्ष आर्क भट्टियों के लिए परीक्षण के तरीके ( पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 25.180.10
Date of Project Approval : 09-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 12306: 2024
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 12306: 2024


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Industrial process measuring instrument
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Steel
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60676: 2011
Organization Type: IEC

Division Council Chairperson Approval Details
Request Date: 18-12-2023
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Ashok Kumar Rajput
Attachment :  View File 1
 View File 2
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS/IEC 60519 : Part 1: 2020 SAFETY IN INSTALLATIONS FOR ELECTROHEATING AND ELECTROMAGNETIC PROCESSING - PART 1: GENERAL REQUIREMENTS

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 IEC 60398 - - 1999
2 IEC 60519 4 - 2021

Sl.No. Synosis Points
1 This standard specifies test procedures, conditions and methods according to which the main parameters and the main operational characteristics of electric arc furnaces (EAF) operated either with alternating current (EAFac) or with direct current (EAFdc) with a capacity above 500 kg/heat are established

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-07-2023 05-12-2023 20-02-2024 05-07-2024 Mr. ASHOK KUMAR 05-07-2023