Document Details
Name of Department/Committee : ETD 18
Document Number : ETD 18 ( 22822)
Document Title [English] : Methods of tests for submerged - Arc furnaces ( First Revision )
Document Title [Hindi] : जलमग्न-आर्क भट्टियों के लिए परीक्षण की विधियाँ ( पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 25.180.10
Date of Project Approval : 09-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10215: 2024
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10215: 2024


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Switchgear, Metering and Accessories
Sub Sub Group : Industrial process measuring instrument
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Power
  • Ministry of Steel
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC IEC 60683: 2011
Organization Type: IEC

Division Council Chairperson Approval Details
Request Date: 18-12-2023
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Ashok Kumar Rajput
Attachment :  View File 1
 View File 2
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS/IEC 60519 : Part 1: 2020 SAFETY IN INSTALLATIONS FOR ELECTROHEATING AND ELECTROMAGNETIC PROCESSING - PART 1: GENERAL REQUIREMENTS

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 IEC 60398 - - -
2 IEC 60519 4 - 2021

Sl.No. Synosis Points
1 This standard specifies test procedures, conditions and methods according to which the main parameters and the main operational characteristics of a submerged-arc furnace (SAF) with rated electrical power levels above 500 kVA are established. This standard is applicable to SAF with one or more electrodes.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 05-07-2023 05-12-2023 20-02-2024 05-07-2024 Mr. ASHOK KUMAR 05-07-2023