Document Details |
|
Name of Department/Committee : | TED 14 |
---|---|
Document Number : | TED 14 ( 22915) |
Document Title [English] : | SPACE SYSTEMS EARLY OPERATIONS PART 1 SPACECRAFT INITIALIZATION AND COMMISSIONING |
Document Title [Hindi] : | अंतरिक्ष पद्धतियां — प्रारंभिक प्रचालन भाग 1 अंतरिक्ष यान प्रारंभन और कमीशनिंग |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 49.140 |
Date of Project Approval : | 06-07-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Logistics Services |
Sub Group : | Transport and Logistics Services |
Sub Sub Group : | Transport Services |
Aspects : | Process Specification |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 10784-1 : 2011 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning. This part of ISO 10784 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the initialization p |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 06-07-2023 | ------- | ||
2 | P-Draft Waived | 16-07-2023 | ------- | ||
3 | WC Draft | 16-07-2023 | Duration : 60 Days Submitted for HOD approval Remarks : The Document is being Wide Circulated for 60 days for Comments |
------- | |
4 | WC Draft | 16-07-2023 | WC approved by HOD |