Document Details |
|
Name of Department/Committee : | TED 14 |
---|---|
Document Number : | TED 14 ( 22920) |
Document Title [English] : | SPACE SYSTEMS - SUBSYSTEMSUNITS TO SPACECRAFT INTERFACE CONTROL DOCUMENT |
Document Title [Hindi] : | अंतरिक्ष पद्धतियाँ — अंतरिक्ष यान अंतराफलक नियंत्रण दस्तावेज में उपतंत्र/इकाई |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 49.140 |
Date of Project Approval : | 06-07-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Logistics Services |
Sub Group : | Transport and Logistics Services |
Sub Sub Group : | Transport Services |
Aspects : | Process Specification |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 11892 : 2012 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This International Standard provides space system manufacturing organizations with the minimum interface related items and generic format for creating the interface control document (ICD) which subsystems or units suppliers prepare for spacecraft systems (SC) integrators. In this International Standard, ICD is not defined to contain descriptions regarding various properties of subsystems or units or tasks to be done by suppliers, i.e. performance, functions, endurance to launch mechanical environment, or quality assurance provisions. Such descriptions are presumed to be defined in other contractual documents such as technical specifications. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 06-07-2023 | ------- | ||
2 | P-Draft Waived | 18-07-2023 | ------- | ||
3 | WC Draft | 18-07-2023 | Duration : 60 Days Submitted for HOD approval Remarks : The Document is being Wide Circulated for 60 days for Comments |
------- | |
4 | WC Draft | 19-07-2023 | WC rejected by HOD Remarks: Please make the corrections |
------- | |
5 | WC Draft | 25-07-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 25-07-2023 | WC approved by HOD |
TEDC TED 14, | ------- |