Name of Department/Committee : TED 14
Document Number : TED 14 ( 22932)
Document Title [English] : SPACE SYSTEMS - SURFACE CLEANLINESS OF FLUID SYSTEMS - PART 4 : ROUGH-CLEANING PROCESSES
Document Title [Hindi] : अंतरिक्ष प्रणालियाँ — द्रव तंत्र की सतह की सफाई भाग 4 : रफ-क्लीनिंग प्रक्रियाएँ
Document Type : New
Language : English
Priority : 1
ICS Code : 49.080
Date of Project Approval : 06-07-2023
Standards to be Superseded :


Classification Details
Group : Transport and Logistics Services
Sub Group : Transport and Logistics Services
Sub Sub Group : Transport Services
Aspects : Process Specification
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Civil Aviation
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 14952-4 : 2003
Organization Type: ISO

Sl.No. Synosis Points
1 This standard is identical adoption of ISO 14952-4:2003.
2 This part of ISO 14952 provides requirements for related to rough-cleaning processes used to prepare parts and components for precision cleaning. It identifies precleaning processes that can be used for ground support equipment, launch vehicles and spacecraft. Rough cleaning removes contaminants such as weld scale, heat-treat scale, corrosion, oxide films, oils, grease, shop soil, fuel and carbon deposits. Rough cleaning is considered a normal shop process and usually does not require special environmental controls, packaging, handling or storage beyond accepted good practice. This part of ISO 14952 is applicable equally to ground support equipment, launch vehicles and spacecraft.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-07-2023 14-10-2023 14-11-2023 14-01-2024 SHRI SHIVAM AGGARWAL 14-07-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-07-2023 -------
2 P-Draft Waived 27-07-2023 During 27th SC meeting, the committee decided to WC the document for 60 days. -------
3 WC Draft 27-07-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 27-07-2023 WC approved by HOD
TEDC   -------