Document Details
Name of Department/Committee : TED 14
Document Number : TED 14 ( 22940)
Document Title [English] : SPACE SYSTEMS - ASSESSMENT OF SURVIVABILITY OF UNMANNED SPACECRAFT AGAINST SPACE DEBRIS AND METEOROID IMPACTS TO ENSURE SUCCESSFUL POST-MISSION DISPOSAL
Document Title [Hindi] : अंतरिक्ष प्रणालियाँ — मिशन के बाद सफल निपटान सुनिश्चित करने के लिए अंतरिक्ष मलबे और उल्कापिंड प्रभावों के खिलाफ मानवरहित अंतरिक्ष यान की उत्तरजीविता का आकलन
Document Type : New
Language : English
Priority : 1
ICS Code : 49.140
Date of Project Approval : 06-07-2023
Standards to be Superseded :


Classification Details
Group : Transport and Logistics Services
Sub Group : Transport and Logistics Services
Sub Sub Group : Transport Services
Aspects : Process Specification
Risk : Low
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Civil Aviation
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 16126 : 2014
Organization Type: ISO

Sl.No. Synosis Points
1 This standard is identical adoption of ISO 16126:2014.
2 This International Standard defines requirements and a procedure for assessing the survivability of an unmanned spacecraft against space debris and meteoroid impacts to ensure the survival of critical components required to perform post-mission disposal. This International Standard also describes two impact risk analysis procedures that can be used to satisfy the requirements. This International Standard is part of a set of International Standards that collectively aim to reduce the growth of space debris by ensuring that spacecraft are designed, operated, and disposed of in a manner that prevents them from generating debris throughout their orbital lifetime. All of the primary debris mitigation requirements are contained in a top-level International Standard. The remaining International Standards, of which this is one, provide methods and processes to enable compliance with the primary requirements.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-07-2023 14-10-2023 14-11-2023 14-01-2024 SHRI SHIVAM AGGARWAL 14-07-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 06-07-2023 -------
2 P-Draft Waived 27-07-2023 During 27th SC meeting, the committee decided to WC the document for 60 days. -------
3 WC Draft 27-07-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 27-07-2023 WC approved by HOD
TEDC   -------