Document Details |
|
Name of Department/Committee : | TED 14 |
---|---|
Document Number : | TED 14 ( 22940) |
Document Title [English] : | SPACE SYSTEMS - ASSESSMENT OF SURVIVABILITY OF UNMANNED SPACECRAFT AGAINST SPACE DEBRIS AND METEOROID IMPACTS TO ENSURE SUCCESSFUL POST-MISSION DISPOSAL |
Document Title [Hindi] : | अंतरिक्ष प्रणालियाँ — मिशन के बाद सफल निपटान सुनिश्चित करने के लिए अंतरिक्ष मलबे और उल्कापिंड प्रभावों के खिलाफ मानवरहित अंतरिक्ष यान की उत्तरजीविता का आकलन |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 49.140 |
Date of Project Approval : | 06-07-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Logistics Services |
Sub Group : | Transport and Logistics Services |
Sub Sub Group : | Transport Services |
Aspects : | Process Specification |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 16126 : 2014 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This standard is identical adoption of ISO 16126:2014. | |
2 | This International Standard defines requirements and a procedure for assessing the survivability of an unmanned spacecraft against space debris and meteoroid impacts to ensure the survival of critical components required to perform post-mission disposal. This International Standard also describes two impact risk analysis procedures that can be used to satisfy the requirements. This International Standard is part of a set of International Standards that collectively aim to reduce the growth of space debris by ensuring that spacecraft are designed, operated, and disposed of in a manner that prevents them from generating debris throughout their orbital lifetime. All of the primary debris mitigation requirements are contained in a top-level International Standard. The remaining International Standards, of which this is one, provide methods and processes to enable compliance with the primary requirements. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 06-07-2023 | ------- | ||
2 | P-Draft Waived | 27-07-2023 | During 27th SC meeting, the committee decided to WC the document for 60 days. | ------- | |
3 | WC Draft | 27-07-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 27-07-2023 | WC approved by HOD |
TEDC | ------- |