Document Details
Name of Department/Committee : CHD 34
Document Number : CHD 34 ( 22988)
Document Title [English] : Environmental management systems Guidelines for incorporating eco-design
Document Title [Hindi] : पर्यावरणीय प्रबंधन पद्धतियाँ — ईको-डिजाइन को शामिल करने के लिए दिशानिर्देश
Document Type : New
Language : English
Priority : 2
ICS Code : 03.100.70; 13.020.10
Date of Project Approval : 13-02-2023
Standards to be Superseded :


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Environment management
Sub Sub Group : Environmental Management
Aspects : System Standard
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : Environmental management systems — Guidelines for incorporating eco-design
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
  • CLIMATE ACTION
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : ISO 14006: 2020
Organization Type: ISO

Sl.No. Synosis Points
1 This document gives guidelines for assisting organizations in establishing, documenting, implementing, maintaining and continually improving their management of eco-design as part of an environmental management system (EMS). This second edition cancels and replaces the first edition (ISO 14006:2011), which has been technically revised. The main changes compared with the previous edition are as follows:
2 Clause 6, which covered eco-design at an operational level, has been deleted due to the development of IEC 62430:2019 (however, the basic information has been retained in a new Annex C);  the structure has been adapted to ISO 14001:2015;  the boxes related to ISO 14001 and ISO 9001 have been removed;  text has been added to address management issues related to the outsourcing of eco-design;  a new Clause 11 covering management issues associated with setting eco-design has been added.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 17-07-2023 17-11-2023 17-12-2023 17-04-2024 Mr. Mohit Garg 17-07-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-02-2023 -------
2 P-Draft Waived 21-09-2023 Document Approved from WC in 29th Meeting of CHD 34 -------
3 WC Draft 21-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 29-09-2023 WC approved by HOD
CHDC  CHD 34 : 2, -------