Document Details |
|||||
Name of Department/Committee : | CED 39 | ||||
---|---|---|---|---|---|
Document Number : | CED 39 ( 22018) | ||||
Document Title [English] : | Criteria for Blast Resistant Design of Structures Part 1 Above-Ground Explosions | ||||
Document Title [Hindi] : | संरचनाओं का धमाके प्रतिरोधी युक्ति के लिए मानदंड भाग 1 अधितल विस्फोट | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 91.120.25 | ||||
Date of Project Approval : | 30-12-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Safety of structures |
Sub Sub Group : | Earthquake Resistant & Blast Resistant design |
Aspects : | Code of Practice |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | Criteria for design of buildings subjected to above ground blasts |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard prescribes the minimum criteria for analysis and design of new structures for blast effects of above-ground explosions under three different detonation scenarios: surface burst, free-air burst, and air burst. The primary objective of this standard is to minimize human casualties and safeguard assets due to above ground explosions. The performance expectation of a structure designed as per the provisions of this standard would depend on the type of protection category selected for that structure and the blast loading determined through threat assessment. | |
2 | This standard shall be used in conjunction with other applicable standards for analysis and design of structures. This standard does not supersede or replace other design standards. This standard shall be applicable if design against malevolent or accidental blast loading is determined to be a credible threat to a structure. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 30-12-2022 | ------- | ||
2 | P-Draft | 24-02-2023 | Covering letter generated | ------- | |
3 | P-Draft | 24-02-2023 | Duration : 14 Days | CED 39, | ------- |
4 | Skipped to W-Draft | 01-09-2023 | Stage-Changed | ------- | |
5 | WC Draft | 01-09-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 01-09-2023 | WC approved by HOD |
CEDC CED 39, CED 02, CED 46, CED 38, | ------- |